Multi-Unit Repipe Specialists -- Albany

Multi-Family Repiping
in Albany

More than a third of Albany’s housing, about 2,800 units, is in buildings of five or more units, and 56.8% of the occupied ones predate 1980. We repipe them with residents home, typically with one day of no water.

★★★★★5.0 on Google · 116 reviewsRead reviews
Water Off Typically Just One Day 30-Year Labor & Materials Warranty Insurance Claim Assistance CSLB Licensed & Fully Insured

Request a Project Bid

In a city where nearly half of occupied homes are rented, the plan has to work for people living there, so that’s what our bid spells out.

  • Per-unit bid after a free walkthrough
  • Building Division permit and inspections on us
  • Tenant and owner notices at no extra cost
Request a bid → (408) 295-4309

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“Gil, Valentino, and Travis helped me out on short notice with a Repipe. Our water was out and they managed to squeeze us into their schedule and get us up and running again. Thank you guys!”

Ellice K. · Google review · Feb 2026
CSLB #1057926 Licensed & Insured Uponor Certified Installer 30-Year Labor & Materials Warranty 5.0★ 116 Google Reviews

Albany’s apartments and condos: older, and split by owner type

Multi-unit housing is a large part of Albany. Of 8,070 housing units, about 2,800, or 34.7%, sit in buildings with five or more. Rentals account for 46.9% of occupied homes. Half of all local housing dates from 1951 or earlier, going by the median year built.

Who lives in what size building

The tenure split is what stands out. Small and mid-size buildings are mostly rented, but in the largest group, renters and owners are nearly even.

Building sizeRentedOwner-occupied
5-9 units47213
10-19 units63453
20-49 units38789
50+ units463447

Occupied homes only, from US Census Bureau tables in the ACS 2020-2024 5-year estimates.

In practice, that can mean two different buyers. A smaller rental may come down to one owner’s call. A big building with many owners may involve an HOA board, which will want documents it can share. We’re set up for both.

When they were built

Across 2,558 occupied homes in these buildings, the biggest band is 1960 to 1979, at about 1,060. Add 372 from 1940 to 1959 and 21 from 1939 or earlier, and 56.8% predate 1980. Later construction adds 562 from 1980 to 1999 and 543 from 2000 to 2019.

What can be inside those walls

Pre-1970s buildings can still have galvanized steel or early copper in service. No Census figure will tell you whether yours does. It takes a look. What we know generally is how each fails. Galvanized loses inside diameter to corrosion, and flow goes with it. Older copper leaks at pinholes. With units stacked, a leak on an upper floor can reach several homes.

Water and permits

The whole city gets its water from the EBMUD (East Bay Municipal Utility District). That district’s 2025 Annual Water Quality Report traces the main supply to Sierra snowmelt and rain in the Mokelumne River watershed, held in Pardee Reservoir and sent to the East Bay by aqueduct. The report’s service map appears to list Albany under the Orinda treatment plant, where hardness ranged from 14 to 40 ppm with no average given. In times of high demand or maintenance, an area can be served from another plant, such as Sobrante at 64 to 98 ppm.

Your plumbing permit comes from the City of Albany Community Development, Building Division. We file it. We also book the inspections, and someone from our company will be there when they happen.

The work itself

Nothing starts without a site visit. After it, you’ll have a per-unit bid in writing, in whichever you choose, Uponor PEX-A or Type L copper. People go on living in their homes throughout. Typically we lay new pipe parallel to the old, the building runs on existing lines meanwhile, and one day without water covers the switchover. Our project manager is your contact, and any wall we open gets patched and textured.

Tenants and owners both need warning, so we hand over email and door-notice templates plus a schedule, no extra cost. A hanger on each door gives 7-day warning of the switchover date. For an association, the bid is RFP-ready and sorts association pipe from unit-owner pipe. As for credentials, we specialize in repipes, and you’re hiring a licensed and insured contractor, number CSLB #1057926.

New buildings too

On the building side, Census permit data logs 62 units authorized for 5+ unit buildings in 2022, and 198 in 2025. We plumb new multi-unit housing and senior living as well, bidding from the plumbing sheets, a count of units and your calendar.

Other Alameda County cities

You’ll find local details for Berkeley, Emeryville and Oakland on their own pages. Our Alameda County multi-unit list covers the rest.

Multi-Unit Repiping & Plumbing in Albany

Albany has apartment owners, condo boards and a few care facilities. Each of these cards draws on the local numbers.

Albany apartment owners

ACS counts 1,956 rented homes in Albany’s 5+ unit buildings, and most of them are in buildings under 50 units: 634 in the 10-19 group alone. You’d get a written price per unit after we walk it. Tenants stay in place for the duration, which matters to you and to them.

Apartment repiping in Albany →

Albany condo boards

Owners occupy 602 homes in the city’s 5+ unit buildings, with 447 up in the 50-plus group. So some boards here may oversee a big property. The bid we hand over is RFP-ready, our insurance certificates carry the association’s name, and the scope marks association versus unit-owner piping per your CC&Rs.

HOA & condo repiping in Albany →

Senior living in Albany

Albany’s licensed Residential Care Facilities for the Elderly come to 4, licensed for 250 in all, per CA DSS Community Care Licensing. Administrators work with us directly. Plans include extended notice for residents, flexible dates and early attention to ADA bathrooms and medical drains in our written scope.

Senior living repiping →

Albany hotels and motels

Our data has no hotel or motel figure for Albany, but if you operate lodging here, we can repipe with guests in mind. A walk of the property sets the price. Then your operations staff and ours set room blocks, which means you can see what’s out of inventory and when, and plan around it.

Hotel and motel repiping →

Plumbing new Albany buildings

The 5+ unit line in the Census permit survey reads 62 units for 2022 and 198 for 2025. For new residential or senior living buildings here, the written bid comes from your plumbing sheets, how many units and when. New hotels fall outside the scope of what we plumb.

New construction plumbing in Albany →

What Sets Us Apart on Albany Multi-Family Projects

With 3,576 renter households in town, plenty of people live with whatever an owner decides. Here’s how we plan around them.

Project manager as your contact

Every Albany project gets a dedicated PM -- your single point of contact from bid to warranty.

One day off the water

That’s typically all. Residents use the existing lines until switchover, stay in their homes the whole time, and get patched and textured walls where we opened them.

Tenant and owner notices

You receive door and email templates plus a schedule at no extra cost. Each door gets a 7-day hanger naming the switchover, so residents know the date.

Dealing with an adjuster

A leak between stacked units can turn into a claim. We’ll deal with the adjuster and pass along the documentation insurers want. Approval isn’t ours to promise.

A price for every unit

We visit first, free of charge. The written bid then lists a per-unit figure, so you can present it to co-owners or a board.

Credentials you can check

You can look up CSLB #1057926. Licensed and insured. Repipes are our specialty. Parts and labor sit under an up to 30-year warranty.

Albany Multi-Family Repiping FAQs

Census estimates for 2020-2024 put about 2,800 of 8,070 housing units, or 34.7%, in five-or-more-unit buildings. About 910 of those belong to the 50-plus group.
56.8% of 2,558 occupied homes in them predate 1980, and about 1,060 are from 1960 to 1979. All housing in the city has a median year built of 1951.
EBMUD serves the whole city, drawing mainly on the Mokelumne River watershed through Pardee Reservoir. Its 2025 report shows a hardness range of 14 to 40 ppm for the Orinda plant its map appears to assign to Albany.
From the City of Albany Community Development, Building Division. Our side does the filing and attends the inspections.
Yes. The Census Building Permits Survey lists 198 units for 5+ unit buildings in 2025, after 62 in 2022.
We can, but only after a walkthrough, since unit count and pipe routing are what determine it. You’ll find the schedule in the bid itself.
Just at switchover, typically one day. The new pipe runs parallel to the old beforehand, so the existing lines keep working.
Read the CC&Rs before anything else; they often require copper. Otherwise, either is a long-term choice, and Uponor PEX-A’s fewer fittings and faster installation usually lower the total on a building that large. We recommend after the walk.

Other Multi-Family Cities in Alameda County

Albany is one of our Alameda County pages, and the county’s other cities are linked below.

See all of Alameda County →

Ready to Repipe Your Albany Building?

Arrange a walkthrough of your building, with no obligation on your side. A free written bid comes after.

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work