Apartments

Apartment Repiping in Danville

Danville is a town of owners, yet 640 of its rented homes sit in buildings of five-plus units, and 521 homes in that size class date from 1980-1999.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”

KUNA L. · Google review · Sep 2026

How Danville’s rentals divide by building size

Only 14.5% of Danville’s occupied homes are rented, about 2,300 in all. Of those rentals, 640 are in properties of five-plus units and 182 in two-to-four-unit properties. The top size class is also the biggest, at 237 rented homes in the 50-plus group. Counting every unit, occupied or not, five-plus properties hold 967 homes, 6.0% of Danville’s housing.

Apartments per building Homes with renters
5 to 9 159
10 to 19 179
20 to 49 65
50 or more 237
Subtotal, 5 or more 640
2 to 4 182

Numbers come from Census ACS five-year data, 2020-2024: B25032 sorting tenure by building size, B25024 counting units, B25127 giving year built, B25035 the median.

Building age and supply piping

Danville’s apartment stock mostly went up between 1980 and 1999. Of the 844 occupied homes counted in its larger properties, 521 are from 1980-1999. Older work is a minority, with 206 from 1960-1979 and 20 from 1940-1959, which makes 26.8% pre-1980. Newer still are 61 from 2000-2019 and 36 from 2020 on. For the town’s housing as a whole, 1980 is the median year built.

So for most of these buildings the question is how supply lines of that age are holding up. Copper from then can develop pinhole leaks, and one failure in a shared wall can reach the unit beside it. The smaller pre-1980 group may have galvanized steel, which corrodes from within until flow suffers. Whatever you have, the pattern to watch is repeat calls. Once leaks keep appearing around the property, a planned repipe replaces all supply lines on dates you can plan for.

Our process for owners and managers

Tenants stay put. Our usual sequence for a Danville property looks like this:

  • Notice: you get templates from us, and the door-hanger version reaches each tenant 7 days out, printed with the changeover date.
  • Installation: the taps keep working because we typically lay fresh lines alongside the old ones.
  • Switchover: water shuts off for one day to move the property onto the new system.
  • Closing up: opened drywall is patched and textured.
  • Timing: your written schedule is part of the bid, shaped by this building rather than a formula.

Material is your call. PEX-A (Uponor) bends around framing and needs fewer fittings; warranty lasts 25 years. Type L copper is a heavier-wall rigid tube, warrantied for 30. Parts and labor are both included.

Permits and inspections

Danville’s Permit Center, part of the Town’s Building Division, takes our application for most properties. Some Danville-addressed parcels are actually unincorporated county land, and those go to Contra Costa County instead, so check your address first. Either way we pull the paperwork and schedule each inspector’s visit. EBMUD (East Bay Municipal Utility District) delivers Danville’s water.

Census figures also show 204 owner-occupied homes in five-plus properties. If owners and renters share your building, the bid lists exactly which doors are in scope, and notices go out the same way to all of them.

Getting a bid for a Danville building

We specialize in repipes. As a licensed and insured contractor (CSLB #1057926), we open with an inspection on site, checking risers, shutoffs and sample apartments, then write up a free bid with per-unit numbers for you. Find general background on apartment repiping, or a town-wide view at multi-unit repiping in Danville.

What Danville owners ask us

When did most Danville apartments go up?

Between 1980 and 1999. That period accounts for 521 of the 844 occupied homes in the town's five-plus unit buildings, and 26.8% predate 1980 (ACS 2020-2024).

Is a Danville building from that period too new for a repipe?

Not necessarily. Age alone doesn't settle it, because that generation of copper is prone to pinholes as it ages. Repeat leak calls are the signal, and our walkthrough looks at the actual pipe before anyone writes a number.

What are Danville tenants told, and when?

Among our templates is a door-hanger, handed out 7 days ahead, showing the changeover date. Water then stops for one day, typically, while the property moves to its new lines.

Could my Danville address need a county permit?

Possibly. Most properties go through the Town's Permit Center, but some Danville-addressed parcels sit in unincorporated Contra Costa County. We pull it from whichever applies.


Apartment Repiping elsewhere in Contra Costa County

All multi-unit repiping in Danville · Apartment Repiping: all cities

Own or manage apartments in Danville? Start here

Share your Danville property address, the number of units and any building plans or past leak records. We will use them to book a walkthrough of the risers and a sample of apartments, then return a free written bid with per-unit figures and a schedule.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work