Apartments

Apartment Repiping in Foster City

About 2,160 occupied homes in Foster City's larger apartment buildings date from 1960 to 1979. If you run one of them, start with a site visit; a per-unit price follows in writing.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”

KUNA L. · Google review · Sep 2026

The 1960s and 1970s shaped Foster City’s apartments

Foster City’s housing has a median construction year of 1976. In buildings with five units or more, occupied homes total about 4,820, and 47.4% of them predate 1980. About 2,160 come from 1960 to 1979 alone, while only 103 are from 1940 to 1959 and 19 from 1939 or earlier. Later decades fill out the rest, with about 1,210 from 1980 to 1999, about 1,270 from 2000 to 2019 and 51 from 2020 on. Those last two bands total 1,323 homes, a newer group unlikely to need a repipe for years.

Renters occupy 49.2% of the city’s occupied homes, about 6,390 of about 13,000. Roughly 3,930 of those households live in buildings with five units or more, leaning toward larger properties: about 1,670 in buildings of 50 or more, and 1,000 in the 20-to-49 band. Another 935 rent in two-to-four-unit buildings. Counting all housing, about 5,250 of the 13,600 or so units here, or 38.5%, are in this five-and-up group. About 2,040 of those reach 50 or more, 1,421 fall in the 20-to-49 band and 1,791 in the five-to-19 range.

Building size category Households renting Households owning
Up to 4 units (2-4) 935 66
5 through 9 554 109
10 through 19 707 252
20 through 49 1,000 322
50 upward 1,672 202
Everything from 5 upward 3,933 885

Source: B25127 (age by structure), B25024 (all units) and B25032 (tenure by units), from the American Community Survey for Foster City, five-year period 2020-2024; median year from B25035.

What decades of service can do to plumbing

Piping in a 1960s or 1970s building may be galvanized steel or copper. Galvanized narrows as it rusts, which can lower pressure and sometimes discolor water, and copper of this age can thin out and develop pinholes. In a stacked building, a leak on one floor can reach homes under it. Owners facing that pattern often stop repairing one line at a time and look at replacing the system on a planned schedule.

Tenure adds a wrinkle in this city. Owners occupy 885 homes in these larger buildings, a large number against the 3,933 rented, so some properties may hold both. Those owners cluster in the middle sizes, with 322 in the 20-to-49 band and 252 in the 10-to-19 band, plus 202 at 50 or more. Where renters make up most of a building, clear notice matters most, because each household needs to know which day the water will be off.

A Foster City repipe with residents at home

You get a written schedule. Installation typically puts new pipe next to the old lines, the building stays on its water through that stage, and water is off for one day at the switchover.

  • Notice templates for tenants, with a door-hanger for 7 days out stating the switchover date.
  • Type L copper, carrying a 30-year warranty, or Uponor PEX-A, carrying 25 years, both on parts and labor.
  • Patch and texture for any drywall opened along the way.

It helps to have your unit count and recent leak history handy when you call.

Where Foster City permits and water come from

We pull the permit through Foster City’s Community Development, Building Division, and then we book each inspection and attend it. Estero Municipal Improvement District (EMID), the City of Foster City’s water supplier, serves these buildings.

Bidding one building or several

Your free estimate starts with a walkthrough at the property. Your written per-unit bid comes after that, giving you a basis for planning a single building or a group of them. Repipe Champions holds license CSLB #1057926 and is licensed and insured. Other property types appear under multi-unit repiping in Foster City, and you can read about the apartment repiping service itself.

Frequently asked questions

How old is Foster City's apartment housing?

All housing here has a median construction year of 1976. In buildings with five units or more, 47.4% of occupied homes predate 1980, according to the ACS for 2020-2024.

Who is the water supplier for Foster City apartments?

Estero Municipal Improvement District, known as EMID, serves as the City of Foster City's water supplier.

What is the rental count in Foster City apartment buildings?

About 3,930 renter households are in buildings with five units or more, and 935 are in two-to-four-unit buildings, by ACS 2020-2024 figures. Owners occupy 885 more homes in the five-and-up sizes, and 66 in the smaller ones.


Apartment Repiping elsewhere in San Mateo County

All multi-unit repiping in Foster City · Apartment Repiping: all cities

Line up a walkthrough for your Foster City apartment property

Reach out with your address, and we will schedule a site visit, then send a free per-unit bid in writing with a schedule. If you manage more than one building, mention that when you write. CSLB #1057926, licensed and insured.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work