About 5,170 Hayward renter households live at 50-plus unit complexes. Large properties need a written schedule and a per-unit bid before anyone picks up a saw.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”
Asking a Hayward complex to clear out for new plumbing rarely makes sense, so the job gets built around people staying home. Residents keep running water during the install because the replacement piping typically runs next to what is there now. The one planned outage is a single switchover day with the water off.
Each door gets a hanger 7 days before that date. Your office receives notice templates and a written schedule to circulate, and that same schedule is part of the bid, so owners and residents hear one consistent plan. Drywall we open to reach the lines is patched and textured before we leave.
Renters make up 42.0% of the city’s occupied homes, about 20,830 households. Size is what stands out: about 5,170 of them live at properties of 50-plus units and about 2,700 at 20 to 49. In all, about 11,620 rent in five-plus unit buildings, with about 2,150 more in 2 to 4 unit properties.
| Building | Homes rented | Homes owned by the occupant |
|---|---|---|
| 2-4 units | 2,145 | 614 |
| 5-9 units | 1,856 | 432 |
| 10-19 units | 1,900 | 284 |
| 20-49 units | 2,695 | 324 |
| 50 or more units | 5,168 | 273 |
| Total, 5+ unit buildings | 11,619 | 1,313 |
Hayward housing tallies draw on 2020-2024 ACS data (5-year) from the Census Bureau. Tenure by building size is table B25032; construction years come from B25035 and B25127.
The median Hayward home was built in 1972, and within 5+ unit buildings, 48.9% of occupied homes predate 1980. The biggest construction groups are 1980-1999, about 5,020 homes, and 1960-1979, about 4,440.
In the pre-1980 properties, original galvanized steel or early copper may still be carrying the water. Galvanized loses inside diameter as it rusts, and old copper tends to pinhole. The 1980s and 1990s properties look younger on paper, yet their copper has been in service for decades. An owner on the third leak claim in a year usually starts asking whether patching still adds up. The site walk gives you a real answer for your building, whichever group it falls in.
Repipe permits here run through the Hayward Permit Center, part of the city’s Building Division. Getting that permit and lining up the inspections is our job, and we stay on site for each visit from the inspector.
Most addresses buy from the City of Hayward’s own water system, which purchases all of its supply from the San Francisco Public Utilities Commission, largely Hetch Hetchy snowmelt. Its 2025 report lists hardness averaging 60 ppm, in a range of 8.1 to 112, and the water carries chloramine as its disinfectant. A part of Hayward is on East Bay Municipal Utility District (EBMUD) instead. We pin down which supplier you have, plus where the building’s valves are, on the walk.
We look at the property in person first. What comes back is a written bid priced per unit, and you pick between Uponor PEX-A and Type L copper. PEX jobs carry 25 years of warranty coverage and copper jobs 30, each including parts and labor. The company is licensed and insured, license CSLB #1057926.
The full service is laid out on our apartment repiping service page. Own other property types here? The Hayward multi-family page covers those.
Very common. American Community Survey figures for 2020-2024 show about 11,620 rented homes at properties of five units or more, about 5,170 of those at 50 or more.
Most addresses are on the city-run Hayward water system, while EBMUD covers a part of Hayward instead. Your bill will say, and we confirm it during the site walk.
Each building differs, so your written bid carries its own schedule. For residents, the water is typically off on just one day, when the building moves over to the new lines.
The City's 2025 water quality report shows hardness averaging 60 ppm, with a range of 8.1 to 112, on water purchased from the SFPUC regional system and disinfected with chloramine.
All multi-unit repiping in Hayward · Apartment Repiping: all cities
Tell us the property, the unit count and the leak history. We walk it with your team, then you get a per-unit price in writing, schedule included, free of charge.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area