Most Los Gatos apartment homes went up before 1980, and 50+ unit complexes hold the most renters in larger buildings. Water is typically off for one day at switchover.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil, Valentino, and Travis helped me out on short notice with a Repipe. Our water was out and they managed to squeeze us into their schedule and get us up and running again. Thank you guys!”
Of about 12,700 occupied homes in town, 35.1% are rented. About 2,100 of those rentals are in five-plus properties, and they skew large: 811 in 50-plus complexes and 612 in 20-49 unit buildings.
| Units in the building | Rented homes in Los Gatos |
|---|---|
| 2-4 units | 735 |
| 5-9 units | 557 |
| 10-19 units | 169 |
| 20-49 units | 612 |
| 50 or more units | 811 |
For the Town of Los Gatos: B25032 tenure-by-building-size counts from the Census Bureau’s 2020-2024 ACS five-year release, and its Building Permits Survey place files.
Small owners count too. The 735 renter homes in duplexes, triplexes and fourplexes follow the same plan as a big complex. In five-plus buildings, owners occupy 374 homes, mostly in 20-49 unit (168) and 5-9 unit (121) buildings. Permits show little new supply: 64 units in such buildings authorized in 2022 and 14 in 2023.
The 1960-1979 group holds about 1,200 occupied homes in Los Gatos five-plus properties, more than any other period, and 55.4% of that housing is older than 1980. Town-wide, the median home was built in 1972.
Supply lines from those years are commonly galvanized or early copper. Corrosion shrinks a galvanized line’s inside diameter and pressure goes with it, sometimes with discolored water. Copper tends to fail in small pinholes that show up as a stain on a neighbor’s ceiling. Replacing the whole system once ends the cycle of chasing them.
Your office gets a written schedule and our notice templates to send under your own letterhead. Then a door-hanger naming the date goes on every apartment, 7 days before the switchover. While the crew works, the old lines keep serving the building, because the new ones typically run alongside them. Switchover day is typically the one day the water is off.
The Town Building Division issues the permit, and its Accela Citizen Portal is where applications go. Pulling it and lining up each inspection is our job, so your staff never logs in. Ordinance 2380 of December 2, 2025 put the 2025 California Plumbing Code into Town Code Article VI. San Jose Water (SJW) supplies the town from a blend that depends on the address: mountain surface water at 151 ppm hardness, groundwater averaging 288 ppm and Valley Water surface water averaging 99 ppm, per its 2025 report.
Both materials have a place in a building like yours. PEX-A bends, so its route can often open less wall. Type L copper is the rigid metal pipe many owners already know. We’ll say which we would use in your building, and why, before you commit.
Pricing per unit lays the scope out by apartment, which helps when you line up notices and lease dates.
On the walkthrough we check the mains, risers and shutoffs and a sample of apartments. Then the written per-unit bid comes to you at no charge. Read the full service on apartment repiping; condos and smaller holdings are under multi-unit repiping in Los Gatos.
In 50-plus unit complexes: 811 renter homes, followed by 612 in 20-49 unit buildings, out of about 2,100 rentals in five-plus properties (ACS 2020-2024, table B25032).
A permit from the Building Division, applied for through its Accela Citizen Portal. We pull it and schedule the inspections as part of the job.
It varies by address. By source, hardness averages from 99 ppm to 288 ppm in the utility's 2025 report, so the answer for your property depends on where it sits.
Their door-hanger arrives 7 days before switchover day. Your office also receives templates for any other notices you send.
All multi-unit repiping in Los Gatos · Apartment Repiping: all cities
Ask us for a walkthrough of the property. You'll get a free written bid, priced per unit, that shows the pipe and the schedule.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area