Manteca's biggest block of five-plus apartment homes dates from 1980-1999, and complexes of 50 or more units house about 1,100 renter households.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“The repipe team was led by Travis, who was incredibly detail-oriented. Valentino worked side by side and they finished ahead of schedule.”
Manteca has about 7,600 rented homes among about 27,600 occupied ones. About 2,500 of those rentals are in five-plus buildings, and complexes of 50 or more alone take about 1,100, nearly as many as all the city’s duplexes, triplexes and fourplexes combined.
| Size of building | Homes rented out |
|---|---|
| 2-4 units | 1,125 |
| 5-9 units | 553 |
| 10-19 units | 402 |
| 20-49 units | 447 |
| 50 or more units | 1,114 |
| Five-plus total | 2,516 |
Numbers come from the ACS 5-year 2020-2024 release (U.S. Census Bureau): B25032 on tenure and building size, B25127 and B25035 on year built, B25024 on all units. Authorized units come from the Census Building Permits Survey, 2022. Supply details come from the City of Manteca 2025 Consumer Confidence Report.
Few of these larger buildings are lived in by owners, just 118 homes, and only 41 in the 2-4 unit group, so a landlord or manager makes nearly every repipe call. Building permits also authorized 100 units in five-plus structures in 2022. All told, Manteca has 2,939 housing units in buildings of that size, 10.2% of its housing.
Manteca’s 1995 median year built hints at the story, and the five-plus counts fill it in: 1,058 homes from 1980-1999 and 873 from 2000-2019, then 388 from 1960-1979, 199 from 1940-1959 and 38 from 1939 or earlier. Those last three groups make up the 23.7% predating 1980.
Owners of buildings from that 1980-1999 stretch should pay attention, since pinhole leaks can start showing up in copper that old. Where a building is older, galvanized steel may be present, and it corrodes from the inside and loses flow. A walkthrough tells you which of these applies to your property.
Our usual sequence avoids a long outage. New pipe typically runs parallel to the old, so the building keeps its water during installation. Seven days ahead of the changeover, a door-hanger from our tenant notice templates tells residents the date. On that one day, the water is shut off so we can switch the building to the new system. Everything is laid out in a written schedule attached to your bid.
You get a choice of two materials. With PEX-A (Uponor), the pipe is flexible and needs fewer fittings, typically meaning smaller wall openings, and the warranty is 25 years. Copper here means Type L, thicker-walled than Type M, warranted for 30. Both warranties include parts and labor, and we are glad to go over them at the property. Afterward, we patch and texture the drywall.
Manteca’s Building Safety Division, within Development Services, issues the permit. Pulling it and arranging inspections falls to us. City of Manteca Public Works supplies the water, and its 2025 report describes a blend: groundwater from 16 wells plus treated surface water from Woodward Reservoir, purchased from South San Joaquin Irrigation District. That same report lists average hardness of 158 ppm at the wells and 31 ppm for what the irrigation district sells the city.
Your free estimate arrives as a written bid once our on-site inspection is done. Since it prices each unit, you can phase a large complex or do a fourplex all at once. Our specialty is repipes; our standing is licensed and insured, CSLB #1057926. Start with apartment repiping for the service overview or multi-family repiping in Manteca for other property types.
It is worth checking. 1,058 occupied homes in Manteca's five-plus buildings date from 1980-1999 (ACS 2020-2024), and copper from those years is a candidate for pinhole leaks.
We do, through Manteca's Building Safety Division, and we schedule the inspections as well.
Yes. About 1,100 Manteca renter homes sit in buildings of 2-4 units, whose owners get a site inspection and a written price per unit, same as a large complex.
A door-hanger from our tenant notice templates, given out 7 days early, tells them the switchover date. The water is then typically off for one day.
All multi-unit repiping in Manteca · Apartment Repiping: all cities
Let us know the address, the unit and building count, when it was built and which plans you have. We then schedule a walkthrough at your Manteca property and send a free written bid per unit, so you can see the job before committing.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area