About 2,800 Menlo Park rentals are in 5+ unit properties, and 53.1% of lived-in homes at that size predate 1980. We repipe them with tenants in place and bid per unit in writing.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“We had a pipe burst in the crawlspace, and when Travis and Val came out to inspect it, they found that all the copper lines were badly corroded from electrolysis. They walked us through the options and we decided to go ahead with a full repipe.…”
The city’s 5+ unit buildings fall into two camps, and they need different plans. Among occupied homes at that size, 53.1% were built before 1980, mainly in 1960-1979 (1,327), with 339 from 1940-1959. Then there is a second cluster of about 1,000 from 2000-2019. Permits in 2022 authorized 776 more units in buildings of five or more. The citywide median year built, for all housing, is 1964.
Repipes come up in the first camp. Pipe of that vintage was often galvanized steel or early copper. The steel rusts from the inside and chokes flow, while aging copper can pinhole, and in a multi-story building one failed line often means repairs in two homes.
Renters occupy about 5,400 homes, 45.8% of the occupied total. About 2,800 of those are at properties with 5+ units, with 993 more in 2-4 unit buildings.
| Property scale | Rented Menlo Park homes |
|---|---|
| 2-4 units | 993 |
| 5-9 units | 599 |
| 10-19 units | 659 |
| 20-49 units | 560 |
| 50 or more units | 952 |
| Every 5+ unit building | 2,770 |
For Menlo Park, tables B25032, B25035 and B25127 supply these figures, all 5-year American Community Survey data for 2020-2024; permit units are from the Census Bureau’s 2022-2025 Building Permits Survey.
Owners live in just 366 homes in five-plus unit buildings and 69 in 2-4 unit buildings. Everything else is rented, which means the repipe decision usually lands on an owner or a property manager.
You and we settle the written schedule together, and we hand you the notice language to go with it. Every household gets a door-hanger 7 days beforehand with the switchover date on it. Because replacement lines typically go in parallel to what is there now, the taps keep running through construction. Residents lose water for a single day, at the switchover, and the same bid spells out the rest of the project schedule. Openings we make in walls come back patched and textured.
If you are weighing the two, PEX-A flexes, takes fewer fittings and usually needs smaller holes in the wall. Copper in Type L is thicker-walled than Type M. The warranty terms above apply to whichever you choose.
The Building Division in City of Menlo Park Community Development accepts permit applications and inspection requests online only, through its Accela portal. We file through it as your contractor, CSLB #1057926, licensed and insured. Water is less simple: Menlo Park Municipal Water covers about half of the city, and the rest falls to California Water Service’s Bear Gulch District, Palo Alto Park Mutual Water Company or O’Connor Tract Co-operative, depending on the address. For the municipal utility’s customers, the 2025 report shows average hardness of 60 ppm on its supply from the San Francisco regional system.
Holding a mixed portfolio? The age split is a sensible first sort. The pre-1980 buildings usually go to the top of the list, and the 2000-2019 buildings are less likely to need a full repipe yet.
We come out at no charge, walk the building and write it up per unit. A price by unit lets you take the 1960s and 1970s properties first, phase around leases and see what each home costs you. Start with our apartment repiping overview, or see all multi-unit work in Menlo Park.
That depends on the address. Menlo Park Municipal Water covers about half the city. Palo Alto Park Mutual, O'Connor Tract Co-operative and Cal Water's Bear Gulch District have the rest. Your water bill names the one that serves you.
Going by 2020-2024 American Community Survey estimates, 53.1% of lived-in homes at 5+ unit properties.
No. Typically the new pipe goes in beside the current pipe and service continues. The shutoff lasts one day, for the switchover, and they get notice 7 days ahead.
No. The City takes building permit applications and inspection requests online through Accela, and we file them for you as the contractor.
All multi-unit repiping in Menlo Park · Apartment Repiping: all cities
Give us the address and a rough unit count. After a walkthrough you get a written per-unit bid and schedule, ready for your next conversation with the owner or partners.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area