Half of Rohnert Park's occupied homes are rented, and about 2,140 renter households live in complexes of 50 or more units, in a stock weighted toward 1980 through 1999.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“We had a pipe burst in the crawlspace, and when Travis and Val came out to inspect it, they found that all the copper lines were badly corroded from electrolysis. They walked us through the options and we decided to go ahead with a full repipe.…”
One period stands out in Rohnert Park’s apartment stock. Out of 4,991 occupied homes in five-plus buildings, 2,408 belong to 1980 through 1999, and another 1,164 to 1960 through 1979. That older group, with small numbers from before 1960, makes 25.8% pre-1980. Median year built citywide is 1982.
Renting and owning split almost evenly here, with 50.1% of occupied homes rented, about 8,610 households. Five-plus buildings account for about 4,500 of them, and complexes of 50 or more for 2,140 of those. Another 1,419 rent in two- to four-unit properties. Counting every housing unit, occupied or not, 5,219 are in five-plus buildings, 29.3% of the city total, with 2,327 in properties of 50 or more.
| Building category | Renting | Owning |
|---|---|---|
| 2-4 units | 1,419 | 180 |
| 5-9 units | 677 | 255 |
| 10-19 units | 701 | 65 |
| 20-49 units | 977 | 55 |
| 50+ units | 2,140 | 121 |
| All 5+ together | 4,495 | 496 |
Rohnert Park housing data comes from the Census Bureau’s ACS five-year release, 2020-2024: B25032 (occupancy by structure size), B25127 (year built), B25035 (median), B25024 (all units) and B25003 (renter share). Supply information is from the City of Rohnert Park’s Water Quality Report 2025.
Copper in a building from those decades is now old enough that pinhole leaks become a real possibility. Older structures may still hold galvanized steel, which rusts inward and restricts flow. Repeat leak calls from the same few buildings are the signal to take seriously, and planning a repipe at that point causes less disruption than continuing to patch.
Buildings in one complex were usually plumbed with the same materials, so a problem in one often surfaces in the others. That is why we prefer to inspect several before you commit to a property-wide plan, even if only one has given you trouble so far.
Your property manager helps us set the order, building by building. Typically, our crew sets replacement lines alongside the old, leaving tenants with running water through construction, and the switchover takes one day without it. A written schedule specific to your site is part of the bid.
Rohnert Park’s permit counter is its Development Services – Building Division. We file there and line up the inspections, so your staff need not. City of Rohnert Park Public Works handles water, and its Water Quality Report 2025 covers Sonoma Water supply blended with water from city wells.
Owner-occupied homes, 496 of them in five-plus buildings, do turn up in the local count. If some of your units are individually owned, mention it during the walkthrough. Pipe choice is yours in every case.
Our specialty is repipes. Rohnert Park owners should know we are licensed and insured, and our license number is CSLB #1057926. Getting a free estimate means an on-site look at the building mains and several representative units, then a written per-unit bid. Our apartment repiping page covers the service, while multi-unit repiping in Rohnert Park takes in other property types.
The largest group, 2,408 of 4,991 occupied homes in five-plus buildings, dates from 1980 through 1999 (ACS 2020-2024).
No. New pipe typically goes in beside the existing lines while tenants keep their water, and it goes off for one day at switchover, with a door-hanger giving that date 7 days beforehand.
Buildings in a complex were usually plumbed with the same materials, so a problem in one often shows up in the others. Seeing several gives a clearer picture before you plan the whole property.
Public Works for the city, which mixes Sonoma Water supply with water from its wells.
All multi-unit repiping in Rohnert Park · Apartment Repiping: all cities
We need the complex address, the building and unit count, its year built and any plumbing drawings. With those details we can book a walkthrough of several Rohnert Park buildings and prepare a free written bid priced for each unit.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area