About 5,840 Walnut Creek homes in 5+ unit buildings date from 1960-1979, and about 7,680 renter households live at that scale. Ask for a written repipe bid after a walkthrough.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”
Buildings of 5+ units hold 36.9% of the city’s housing units, and one period leads the count. Of about 11,910 occupied homes in 5+ unit buildings, about 5,840 came from 1960-1979, and 53.4% overall predate 1980. The citywide median year built is 1974.
Pipe from those years is now past the 45-year mark. It may be galvanized steel, which scales up inside and slows flow, or early copper prone to pinholes, and a site visit tells you which. Stacked units pass trouble downward, so one leak can land in two homes. Owners who add up the callouts often choose to plan the whole job on their own timing.
About 7,680 renter households have addresses with 5+ units, and about 1,320 are in smaller 2 to 4 unit rentals. Large complexes lead the way, with about 3,970 renter homes at 50-plus units and about 2,140 at 20 to 49. There are also about 4,220 owner-occupied homes at the larger properties, such as condos. Boards should look at our multi-unit page for the city, which covers HOA and condo work.
| Building type | Renter homes | Owner homes |
|---|---|---|
| 2-4 units | 1,318 | 1,975 |
| 5-9 units | 757 | 1,747 |
| 10-19 units | 817 | 933 |
| 20-49 units | 2,140 | 389 |
| 50 or more units | 3,967 | 1,155 |
| Sum of 5+ unit buildings | 7,681 | 4,224 |
Numbers for Walnut Creek are drawn from the American Community Survey’s 2020-2024 5-year release at the Census Bureau: tenure and building size come from B25032, age from B25035 and B25127.
The schedule is agreed in writing before anyone starts. It arrives with templates for tenant notices, and each apartment gets a door-hanger that gives the switchover date 7 days early. Our usual approach is to install the new supply lines alongside the old ones, so your building typically keeps its water until the day of the changeover. That single day is the only time residents are without it. Your bid carries the full project schedule. Where we have to cut into drywall, we patch and texture the opening.
The City of Walnut Creek’s Building Division no longer takes applications in person, so everything goes through its online portal. We handle that filing, schedule each inspection and meet the inspector on site. Chapter 9-4 of the Municipal Code adopts the 2025 California Plumbing Code. Two agencies supply water here, Contra Costa Water District (CCWD) and East Bay Municipal Utility District (EBMUD), and your address decides which. CCWD’s 2025 average hardness was 74 mg/L; the EBMUD plants for its part of the city ran from 14 to 27 ppm. We confirm your supplier and valves during the visit.
The walkthrough is free and covers the building plus a sample of units. Afterward you get a written per-unit bid naming the material, either Uponor PEX-A or Type L copper. About 2,140 renter homes are in 20 to 49 unit buildings, so plenty of these jobs are mid-size. Our crews work licensed and insured, CSLB #1057926. To see the process from start to finish, look through our apartment repiping service.
American Community Survey 2020-2024 estimates date 53.4% of occupied homes at 5+ unit properties before 1980, and about 5,840 to 1960-1979.
About 3,970 renter homes are at 50-plus unit properties, roughly half of the about 7,680 renter homes at 5+ unit properties overall.
Yes. Water typically goes off for one day, for the switchover. They get the date by door-hanger 7 days in advance.
It depends on the address, since each serves part of the city. Check a water bill, or we confirm it during our walkthrough.
All multi-unit repiping in Walnut Creek · Apartment Repiping: all cities
Tell us about the building and any leak history. We come out for a walkthrough, confirm your supplier and shutoffs, and put a per-unit price in writing.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area