Only 11.1% of Cameron Park’s occupied homes in five-plus buildings predate 1980, but 767 date from 1980 to 1999, and those supply lines are aging. We repipe occupied apartment, condo and HOA buildings with a written per-unit bid.
Seeing leaks in a 1980s or 1990s Cameron Park building? We will walk it for free and put a per-unit price in writing.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“We had a pipe burst in the crawlspace, and when Travis and Val came out to inspect it, they found that all the copper lines were badly corroded from electrolysis. They walked us through the options and we decided to go ahead with a full repipe.…”
Galvanized steel probably plays a small part in Cameron Park’s plumbing story, because most of the multi-unit stock went up from 1980 on. The estimates count 1,234 occupied homes in five-plus buildings.
| Built during | Occupied homes (buildings with 5+ units) |
|---|---|
| 2000-2019 | 330 |
| 1980-1999 | 767 |
| 1960-1979 | 137 |
Data source: US Census Bureau’s ACS, 5-year estimates spanning 2020-2024. The estimates show nothing before 1960 or after 2019.
Looking at all housing, not just these buildings, the median home dates to 1987. Overall, 1,370 of 7,967 housing units (17.2%) are in five-plus buildings, 366 at properties of 50 or more. Renters hold 1,194 of the occupied homes in five-plus buildings.
The middle row is the one to think about. Original supply lines in those 767 homes are more than 25 years old, and copper develops pinholes with age. In a building with shared walls and stacked units, a leak doesn’t always stay in one home. Spot repairs make sense for a while. When leak calls start coming from different units, the original piping may be wearing across the building and a planned repipe is worth pricing.
The 137 homes from 1960 to 1979 are a different case. They account for that 11.1%, and could still hold galvanized steel, where inner corrosion chokes flow, or early copper. The 330 homes from 2000 to 2019 are generally not where we would expect a repipe conversation yet. All of this is general. A census table doesn’t know what your building has, so we find out by walking it.
Cameron Park isn’t a city, so there is no city permit desk. Permits come from the Building Division of El Dorado County’s Planning and Building Department, at 2850 Fairlane Court in Placerville, with an e-TRAKiT portal for some permit types. County guidance is direct on this work: when concealed water piping has become defective and is replaced with new material, that counts as new work and needs a permit and inspection. Its inspection list includes rough plumbing before anything is concealed, and a final after fixtures are connected.
That rough inspection matters to how a job is sequenced, since walls can’t close before it passes. We pull the plumbing permit and attend those inspections. If your property is in a Cameron Park CSD architecturally controlled area, exterior changes may need CSD approval first, and the County’s contractor application asks for certification that plans went to the architectural committee or HOA where CC&Rs require it. We raise that with the board at the walkthrough so nobody is surprised.
Water here comes from El Dorado Irrigation District (EID) through its Main Water System, which draws on Jenkinson Lake at Sly Park for about half of its supply, plus Forebay Reservoir and Folsom Lake. EID’s 2025 water quality report puts that system’s hardness at 13 mg/L as CaCO3 on average, or about 0.76 grains per gallon.
You will see us on a walkthrough first. A bid then arrives in writing, per unit, for Uponor PEX-A (we hold the installer certification) or Type L copper. Once approved, a written schedule goes out. Residents stay in their homes, because new lines typically get installed alongside the old and service continues right up to a one-day switchover. Tenant notices come from our templates, and the date reaches every door on a 7-day door-hanger. Opened drywall is patched and textured. We specialize in repipes, under CSLB #1057926, as a licensed and insured firm.
Owners elsewhere in the area can read our pages for El Dorado Hills and Placerville, and the El Dorado County page widens the view.
Multi-Unit Services
State licensing data lists 7 Residential Care Facilities for the Elderly in Cameron Park, and census tables cover the apartments and condos. We have no local count for hotels or new buildings, so those start from your site or your sheets.
Renters occupy 1,194 homes in five-plus buildings here, 428 at the 5 to 9 unit size and 366 at 50 or more. Another 599 rent in two-to-four unit buildings. We work with tenants at home. Door notices, emails and schedules are templated at no extra cost, and a 7-day door-hanger is where the switchover date goes.
Apartment repiping in Cameron Park →The estimates show few owners in these buildings, a rough 40, so a board here may be small. It still receives RFP-usable bid pages, a certificate of insurance made out to the association, and a clear line between its piping and unit owners’ piping, taken from the CC&Rs.
HOA and condo repiping →The state’s Community Care Licensing records give Cameron Park 7 Residential Care Facilities for the Elderly, licensed for 396 in total. Care settings call for longer notice and scheduling that bends to the residents’ day, so we plan with the administrator directly. ADA bathrooms and medical drains are scoped from the walkthrough, not improvised on site.
Senior living repiping in Cameron Park →A lodging property gets the same site walk before we price anything. Room blocks get laid out with your operations staff, so inventory is known ahead of time and can be planned. Water method stays the same: new lines first, then a typical one-day switchover at the end.
Hotel and motel repiping →For new residential or senior living buildings under the County’s jurisdiction, the bid rests on plumbing sheets, how many units there are and your schedule. Permits and inspections, including the rough before anything is concealed, stay with us. New hotels aren’t work we take on, so this applies to housing and senior projects.
New construction plumbing →Why Repipe Champions
Younger buildings still need careful handling once people are living in them. Here is how we approach that.
Every Cameron Park project gets a dedicated PM -- your single point of contact from bid to warranty.
New lines typically run beside the working system, so people cook and shower as usual. Expect water off for one day, typically, at switchover; patching and texturing the drywall comes after.
Our door notices, email templates and schedules don’t add to your cost. Before switchover, a 7-day door-hanger puts the date on every door.
A leak claim brings in an adjuster, and we cooperate, providing what the insurer asks to see. Approval rests with the insurer, not with us.
We price nothing sight unseen. A free on-site walkthrough comes first, then per-unit pricing in writing that your owner or board can keep.
Expect an up to 30-year warranty, which reaches both parts and labor. Licensed as well as insured, we hold CSLB #1057926 and specialize in repipes.
Common Questions
Service Area
More of El Dorado County appears below, each place on a page of its own.
See all of El Dorado County →If leak calls are coming from different units, ask for a walkthrough. No obligation, and you keep the free written bid.
Licensed repipe specialists serving the Bay Area