HOA & Condo

HOA & Condo Repiping in Alameda

Alameda's 5+ unit buildings skew old: 73.0% of their occupied homes predate 1980. Schedule a walkthrough for a CC&R-based repipe scope and a written, RFP-ready bid your board can review.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“Travis did the copper. Inspector passed it first shot. All done!”

Morgan G. · Google review · Oct 2026

Who owns homes in Alameda’s attached buildings

Census estimates put about 1,200 Alameda homes in 5+ unit buildings in the hands of the people who live there, and 808 more owner households in duplexes, triplexes and fourplexes. That second group can take in small associations along with owners occupying one side of a duplex, triplex or fourplex. Alameda’s association work can therefore mean anything from a handful of owners to a sizable complex: 504 owners are in the 20-to-49 range and 413 at 50 units or above.

Building size band Owner households
5 to 9 189
10 to 19 72
20 to 49 504
50 or above 413
All from 5 up 1,178
2 to 4 808
Renter households, all from 5 up 7,616

Alameda sources: tenure-by-size table B25032, year-built tables B25035 and B25127, and B25024 and B25003 for citywide shares, from the five-year ACS for 2020-2024, U.S. Census Bureau.

Roughly three in four larger-building homes predate 1980

Alameda’s occupied homes in buildings holding five or more skew old, with 73.0% from before 1980. Years from 1960 to 1979 dominate at about 4,500 homes, with 924 from 1940 to 1959 and 982 reaching back to 1939 or before. Later periods are small, with 1,273 from 1980 to 1999, 891 from 2000 to 2019 and just 212 after that. Half of all Alameda housing dates from 1965 or earlier, going by the median. Rentals outnumber owners heavily in those structures, at about 7,600 to about 1,200, and any condo leased to a tenant counts on the rental side. That rented group includes 2,691 at 50 units or more and 2,379 in the 20-to-49 band. Citywide, 30.4% of housing units fall in that five-plus class, and 49.3% of occupied homes are rented. Another 3,172 renter households live in duplexes through fourplexes, against the 808 owner households there.

Galvanized steel from those decades, where it survives, corrodes from within. Copper that old can pinhole. For an association, the practical trouble is location: supply lines pass through shared walls and ceilings, and stacked bathrooms let a leak travel down. A failure can pull in more than one owner, plus a claim and a board discussion. A planned project gives directors one decision they can budget for and explain to the people who elected them.

Permit Center and EBMUD details

All permitting runs through the Permit Center at Alameda’s Planning, Building & Transportation Department. That center covers fire and planning permits as well as building ones, and submittals are made online. We file the application and schedule the inspections, and our people attend them. EBMUD (East Bay Municipal Utility District) delivers water across Alameda. Directors do not have to manage the permit paperwork to move the project along.

What working with us looks like for an Alameda board

  • The documents come first. Your CC&Rs define who owns which pipe, and our scope follows those definitions.
  • Allowed materials. CC&Rs often specify copper. Warranty coverage on Type L copper is 30 years. PEX-A (Uponor), where your documents permit it, comes with 25. Parts and labor are included in both.
  • Insurance on file. You get certificates of insurance naming the association, and our license number, CSLB #1057926, is one you can verify. We are licensed and insured.
  • One day without water, typically. Fresh pipe generally goes in beside the old while the building stays supplied, and the cutover takes a single day.
  • Finish work. Drywall openings are patched and textured.

Asking for a proposal

Everything starts with an on-site walkthrough of the property and a free estimate. A written, RFP-ready bid comes next, covering the association and owner split, so your directors can read it beside any other response they gather. Further reading sits under HOA and condo repiping and Alameda multi-family repiping.

Frequently asked questions

How far back do Alameda's condo and apartment structures go?

Census survey data for 2020-2024 show that 73.0% of larger-building Alameda homes went up before 1980, and 982 of them date to 1939 or earlier. Half of the city's housing is 1965 or older by median, which is one reason a board here might put repipe on its agenda.

Do you take on small Alameda associations of two to four units?

Yes. Alameda counts 808 owner households in that size range, and some may be small associations. A small association can request a site walkthrough and a written bid with a CC&R-based split of responsibilities.

Which utility serves condo properties in Alameda?

Our city data lists just one, EBMUD, short for East Bay Municipal Utility District. Permits are a separate matter, handled by the Permit Center at the Planning, Building & Transportation Department, and we take care of those filings.


HOA & Condo Repiping elsewhere in Alameda County

All multi-unit repiping in Alameda · HOA & Condo Repiping: all cities

Move your Alameda board from leak repairs to a written repipe proposal

Ask us for a walkthrough and a free estimate. Your directors get an RFP-ready bid with a scope tied to your CC&Rs. CSLB #1057926, licensed and insured.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work