HOA & Condo

HOA & Condo Repiping in Concord

57.1% of homes in Concord's 5+ unit buildings predate 1980, most from 1960 to 1979. Have us walk your property, and your board gets a written bid formatted for its RFP.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“The repipe team was led by Travis, who was incredibly detail-oriented. Valentino worked side by side and they finished ahead of schedule.”

Teneia C. · Google review · May 2025

Most of Concord’s larger buildings predate 1980

Counting all housing, Concord’s median year built is 1970. The picture for 5+ unit buildings is similar: 57.1% of their occupied homes went up before 1980, and about 5,700 of about 11,700 belong to the 1960 to 1979 period alone. Another 721 are from 1940 to 1959 and 275 are older than that. The 1980 to 1999 period holds 3,867, while 2000 to 2019 holds about 1,100. Original pipe from that 1960 to 1979 window would be over 45 years old. Pipe that old can spring pinholes if it is copper, and it can close up with rust if it is galvanized, and in attached homes the water does not stop at a property line.

Where Concord’s homeowners fit in multi-unit housing

Owner-occupied homes in five-plus-unit structures number about 1,400, out of about 28,500 owner-occupied homes citywide. That is the closest Census figure to a condo count. They are spread out by size, with 445 in buildings of 50 or more and 422 in the five-to-nine range. Two-to-four-unit properties hold 937 more, where a small association can have only a handful of members to share a decision.

How big the building is Homes occupied by owners
5 to 9 homes 422
10 to 19 homes 205
20 to 49 homes 333
50 homes or more 445
Subtotal, 5 homes or more 1,405
2 to 4 homes 937
Renter-occupied, 5 homes or more 10,300

Compiled for Concord from B25003, B25024, B25032, B25035 and B25127 in the Census ACS (five-year, 2020-2024) and the Census Building Permits Survey.

The rental count is far larger, at about 10,300 homes in the five-plus group. Any condo an investor leases out falls in that number, so association membership can exceed the owner figure above. A Concord board may be speaking to owners and tenants in the same building. Within that rented group, 4,068 homes are at 50 units or more and 2,496 are in the 20-to-49 band. Across the city, 38.4% of occupied homes are rented, and 26.0% of housing units belong to five-plus-unit buildings. Permits show modest additions: authorizations for new units in structures that size came to 62 in 2022 and 256 in 2023.

What we do for a Concord association

A scope you can explain at the annual meeting. Everything turns on the CC&Rs. We trace association piping and unit-owner piping along the line they draw, and we put that split in writing, so directors have something firm to point to.

Water during the install. Crews typically build the new system alongside the existing one, and homes draw from the old lines until it is ready. A single day with the water off then covers the switchover, and the old pipe is out of service.

Materials your documents accept. The two options are Type L copper and PEX-A (Uponor). A lot of CC&Rs specify copper. Warranty terms are 30 years for copper and 25 for PEX, including parts and labor. Drywall openings get patched and textured afterward.

Concord Building Division and CCWD

Plumbing permits run through the City of Concord Building Division. We obtain the permit, arrange each inspection and stand with the inspector on site. The Contra Costa Water District (CCWD) supplies Concord, and it says water at any given address may come from either of its two treatment plants.

From first visit to written proposal

Call us out for a free estimate and we will walk the property. You then get a written bid set up for RFP comparison, plus certificates of insurance naming the association. Directors can hand it to owners or file it with competing responses. The HOA and condo repiping page explains the service further, and Concord multi-unit repiping covers the city’s other multi-family work.

Frequently asked questions

How many homeowners in Concord live in condo-style buildings?

About 1,400 owner households live in five-plus-unit structures, and 937 in two-to-four-unit properties, according to Census survey estimates for 2020-2024. That smaller group can include small associations and people who occupy part of a property they own.

What era do most of the city's multi-unit homes date from?

The largest period runs from 1960 to 1979, with about 5,700 homes out of about 11,700 occupied homes in 5+ unit buildings. In all, 57.1% went up before 1980, so supply line age is a fair question for a Concord board.

Copper or PEX for a Concord HOA?

Check your CC&Rs first, because they often require copper. We install Type L copper carrying 30 years of parts and labor coverage, or PEX-A (Uponor) carrying 25.


HOA & Condo Repiping elsewhere in Contra Costa County

All multi-unit repiping in Concord · HOA & Condo Repiping: all cities

Line up a written repipe bid for your Concord association

Book a property walk and free estimate, and directors receive a written bid they can use in an RFP, with piping divided under your CC&Rs and certificates naming the association. Licensed and insured, CSLB #1057926.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work