HOA & Condo

HOA & Condo Repiping in Fremont

Fremont has about 2,400 owner-occupied homes in five-plus unit buildings, and the largest age group of occupied homes in such buildings dates from 1980 to 1999.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“We had our home repiped in Fremont and the experience was excellent from start to finish. The team was professional, clean, and finished right on schedule. Everything works perfectly and the communication was clear the whole way through. Highly recommend for anyone needing a repipe!”

Dom A. · Google review · Mar 2026
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023

Counting Fremont’s condo owners

Fremont’s owner-occupied housing runs to about 47,500 homes, overwhelmingly outside multi-unit buildings. About 2,400 are in structures of five-plus units, which is the closest thing the Census offers to a condominium count. The biggest slice is small: 924 owner households at 5 to 9 units. A further 644 live at 2 to 4 units.

Homes in the structure Owner households
5 to 9 924
10 to 19 398
20 to 49 530
50 or more 554
Everything at 5 and up 2,406
2 to 4 644

Fremont tenure figures: ACS 2020-2024 five-year file from the Census Bureau, table B25032. Year-built figures: tables B25035 and B25127 of that release.

Two cautions on reading those numbers. Census tables do not tell condominiums apart from apartments, and an owner who leases out a condo shows up as a renter. Fremont has about 17,000 renter-occupied homes at five-plus units, and some of them may belong to your members. Expect both resident owners and tenants in the same community, a mix our notice templates are written to handle.

Fremont’s 1980s and 1990s complexes

Look at every occupied home in Fremont’s five-plus unit buildings, about 19,400 of them, and about 8,400 came from the 1980-1999 period. Only 32.5% predate 1980, and those include 5,667 from 1960 to 1979. The median year built across all housing types is 1979. Copper that has been in service since the 1980s and 1990s may start forming pinhole leaks.

Attached construction changes what one of those leaks means. Water travels through a shared wall or ceiling into a neighbor’s home, and suddenly a repair turns into a board discussion. Repeating that cycle is what leads many associations to consider a building-wide repipe.

Inside a Fremont community repipe

  • Your community manager holds a written schedule that can go straight out to owners.
  • We hand over notice templates. One is a door-hanger for each home, 7 days beforehand, with the switchover date printed.
  • During installation, the old pipes keep working, because the new ones typically run alongside them. Service typically stops for one day, when we switch over.
  • You can specify Uponor PEX-A or Type L copper, and since CC&Rs often require copper, we bid it whenever yours do.
  • Parts and labor stay under warranty: PEX for 25 years, copper for 30.
  • We patch and texture any drywall opened during the job.

Whose pipe is whose. Our scope follows your CC&Rs, then lists association lines apart from those owned by individual members, so costs land where the documents put them.

Where permits and water come from in Fremont

The Building & Safety Division of Fremont Community Development is the permit authority. Pulling the permit and scheduling its inspections sit on our side of the contract. Alameda County Water District (ACWD) is the supplier here.

An RFP-ready bid for your Fremont board

We specialize in repipes and are a licensed and insured firm, CSLB #1057926. The free written bid comes only after we inspect on site. It lays out each home, material and warranty per unit, with owner and association work apart, ready to sit next to other responses in your RFP. Certificates of insurance come with it, naming the association. Read how repiping for associations and condos works, or see all of our multi-unit repiping in Fremont.

Common questions from Fremont boards

How large is Fremont's condo-style ownership market?

About 2,400 owner households in five-plus unit structures and 644 at 2 to 4 units, per 2020-2024 ACS data. The Census does not separate condos from apartments, so treat that as an estimate.

Our Fremont complex dates from the 1980s. Is that too new for a repipe?

Not necessarily. About 8,400 of Fremont's occupied five-plus unit homes are from 1980 to 1999, an age when copper may form pinhole leaks. Leak history and an inspection tell you more than the date.

How do you handle piping that belongs to unit owners?

Your CC&Rs decide, and our written scope lists each category apart, so your Fremont board can assign costs the way the documents direct.

What water disruption should Fremont residents plan for?

Typically one day, for the switchover, and each home's door-hanger announces it 7 days ahead. Until then the existing pipes stay in service.


HOA & Condo Repiping elsewhere in Alameda County

All multi-unit repiping in Fremont · HOA & Condo Repiping: all cities

Fremont boards: put your repipe on the next agenda

Send the association's name and address, the number of homes and buildings, your CC&Rs section on piping and any plans. Once we have those, we arrange a walkthrough with your community manager and return a free written bid, ready for the RFP file, with association and owner piping separated.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work