HOA & Condo

HOA & Condo Repiping in Larkspur

Nearly half of Larkspur's housing (45.1%) sits in five-plus-unit buildings, and 72.4% of the occupied homes in them predate 1980; 367 of those homes are owner-occupied.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“Gil’s crew ripped the old pipe out in one day. Patched the holes, swept up, water’s clear now. I was sure something would be leftover. Nope. I am very pleased!”

Bre M. · Google review · Sep 2026

The 1960s and 1970s shaped Larkspur’s condo buildings

One era towers over the rest of the record here. About 1,700 of the roughly 2,700 occupied Larkspur homes in five-unit-and-larger buildings come from 1960-1979. Another 237 go back to 1940-1959 and 30 to 1939 or before, which together bring the before-1980 share to 72.4%. By contrast, just 84 arrived in 2000-2019. The city’s overall median year built is 1970.

A board inheriting a building from that period should find out whether anyone has ever replaced its supply lines, since nothing in the Census answers that. Old minutes, escrow disclosures and plumbers’ receipts sometimes do. As the trade generally sees it, galvanized steel gets rough and narrow inside as rust builds up, and copper with long service behind it can leak at pinholes. Either condition is a matter for inspection.

Larkspur’s resident owners, sorted by building size

Owner counts run close together across the sizes here, from 72 homes in the smallest group above four units to 105 at 10-19. No single association model fits. Directors of a nine-unit building and directors of a community many times that size face the same question with very different workloads.

Building, by unit count Owner-resident homes Tenant-resident homes
2-4 61 434
5-9 72 1,054
10-19 105 493
20-49 103 274
50 or more 87 514
Everything from 5 units 367 2,335

Source: Larkspur city estimates, Census Bureau ACS 5-year series 2020-2024; size and tenure from B25032, construction period from B25127, median from B25035.

What Larkspur directors receive in the bid

Directors need a document they can defend to neighbors. After a free walk of the site, we send a free written proposal that is ready for an RFP and clear about the following:

  • Ownership of the pipe. Using your CC&Rs as the reference, the scope tells readers which lines the association carries and which belong to a unit owner.
  • Pipe type. Copper often appears as a requirement in CC&Rs; we offer Type L, warranted 30 years. Where permitted, Uponor PEX-A is the alternative, warranted 25. Labor and parts are covered on each.
  • Insurance evidence. A certificate of insurance can carry the association’s name for your records.
  • Who we are. A California contractor, license CSLB #1057926, both licensed and insured, and we specialize in repipes.

If your association has received other proposals, a useful test is to ask each contractor to mark on one floor plan where their work stops. Differences show up fast.

Working around owners who are home

Residents typically continue to draw water while the replacement lines are threaded in close by the current ones, and then, for just one day, water stops so everything can be switched across. When the board knows that date, circulate it right away. Retired owners, home-based workers and anyone caring for a relative may want extra lead time.

Wall access is part of any repipe, and we patch and texture those openings when we are done. Any other finish decision belongs in the board’s own plan. Note too that a majority of Larkspur households rent (53.5%), so some of your units may be leased. Those owners should pass the date to their tenants.

Larkspur’s building counter and Marin Water

The city has its own Building Division, with a permit counter listed on its page. We pull the permit and arrange inspections through that office. Service comes from Marin Water, formally the Marin Municipal Water District. By its 2025 count, about 75% of supply starts as rainfall over Mt. Tamalpais and the west Marin hills, then blends with Russian River water. Listed average hardness is 59 mg/L for reservoir water and 112 mg/L for the Russian River supply.

For a broader view, open the multi-unit overview for Larkspur or the main community association repipe page.

Frequently asked questions

Do most of Larkspur's larger buildings date from one period?

Citywide, about 1,700 occupied homes in larger buildings, rented and owned, come from 1960-1979, the biggest group by far. Your own building's date and repair history still need checking.

Can leased units in our association be included in the scope?

Yes. The scope follows your CC&Rs regardless of who lives in the unit, and the owner should tell the tenant about the switchover date.

What will we have to shut down during the project?

Typically just the water, for one day at the switchover, because the taps keep running while the new pipe goes in.

What should a Larkspur director have ready for the walkthrough?

The CC&Rs, any plumbing receipts, and a list of units with leak trouble. If the building has older minutes that mention pipe work, bring them too.


HOA & Condo Repiping elsewhere in Marin County

All multi-unit repiping in Larkspur · HOA & Condo Repiping: all cities

Have your Larkspur association's piping walked and bid in writing

Give us a call, or complete the bid request lower down, to choose a walkthrough date. Your association gets a free RFP-ready proposal from that visit.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work