HOA & Condo

HOA & Condo Repiping in Novato

Most Novato owners in multi-unit homes live in small buildings: 354 at 2-4 units and 286 at 5-9, the scale where one director may end up running a repipe.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“The repipe team was led by Travis, who was incredibly detail-oriented. Valentino worked side by side and they finished ahead of schedule.”

Teneia C. · Google review · May 2025

Novato’s owner-occupied homes lean toward small buildings

Larger Novato buildings hold few resident owners. Only 35 owner-occupied homes appear at 50 units or more, 67 at 20-49 and 61 at 10-19. The weight falls lower down: 286 at 5-9 units and 354 at 2-4. Census data does not say which of these belong to an association. If yours does, the board may well be a few volunteer neighbors.

Building scale (units) Owner-occupied Tenant-occupied
2-4 354 839
5-9 286 931
10-19 61 585
20-49 67 1,152
50+ 35 915
All at 5+ units 449 3,583

Source: table B25032 for Novato city, American Community Survey five-year sample, 2020-2024, published by the Census Bureau; construction years from tables B25127 and B25035.

Novato’s construction years, and what they can and cannot tell you

Of about 4,000 occupied homes in five-plus unit Novato buildings, 48.6% were built before 1980. Roughly 1,600 come from 1960-1979 and about 1,400 from the next two decades, with 660 from 2000-2019. The median across all Novato housing is 1975.

A small board may have no original plans and no idea what is behind the drywall. In that case start with what can be seen: exposed pipe at the water heater, in a garage ceiling or at a shutoff valve. Galvanized steel rusts internally and tightens the path for water as it does. Older copper can pinhole. Neither pattern is a verdict on your property, but either one justifies asking for a proper look.

What a Novato HOA gets on paper

Few volunteer treasurers have written a plumbing RFP, and nobody needs to start from a blank page here. After an on-site walkthrough, we deliver a free written bid that is RFP-ready, so it can be read beside anything else you collect.

  • The scope names which pipe is common and which pipe is an owner’s, based on your CC&Rs. With six or eight neighbors sharing an assessment, that one distinction tends to settle the most arguments.
  • Insurance certificates name your association.
  • Material and warranty: Type L copper at 30 years or PEX-A by Uponor at 25, parts and labor included. Read your CC&Rs first, because many require copper.
  • Licensing: state number CSLB #1057926. Our firm is licensed, insured, and focused: we specialize in repipes.

Questions worth asking of anyone who bids: Which walls will be opened? Who restores them? Are the inspections included in the price you quote?

Living at home through the project

In a small building, the board and the residents are often the same people, and everyone knows whose schedule is tight. Daily life carries on: new lines typically get installed in parallel with the existing plumbing while taps keep working, with typically one day without water for the final switchover. If a neighbor has a medical need or works nights, raise it at the walkthrough. We patch and texture every wall opening we make.

Small groups also tend to have uneven plumbing histories. One owner may have replaced lines during a kitchen remodel while the unit next door still has everything original. Write down what each household remembers before we arrive, because that information changes how the board reads the scope and how owners feel about sharing the bill.

Novato permits and water

The Building Division of Novato Community Development handles permitting. Our crew pulls the permit and books each inspection.

North Marin Water District delivers water across greater Novato. According to its 2025 annual report, Sonoma County Water Agency sells the district most of its supply as treated Russian River water, about 25% comes from the district’s Stafford Lake plant, and the two blend in the system. Reported average hardness is 110 mg/L for the agency’s water and 91 mg/L for Stafford water.

More context lives on the Novato multi-unit services page and on our guide to condominium and HOA piping projects.

Frequently asked questions

Our six-unit Novato association has no manager. Can we still request a bid?

Yes. A director can schedule the walkthrough and receive the written bid directly.

How common are small owner-occupied buildings in Novato?

The ACS puts 286 owner-occupied homes in 5-9 unit buildings, far more than the 35 in buildings of 50 or more. Another 354 are at the 2-4 unit scale.

Do our CC&Rs decide between copper and PEX?

They can. CC&Rs often require copper, so check before you settle on a material. PEX-A remains an option where your documents allow it.

Who deals with Novato's permit and inspections?

We schedule them and pull the permit as well, so that paperwork does not fall on a volunteer board member.


HOA & Condo Repiping elsewhere in Marin County

All multi-unit repiping in Novato · HOA & Condo Repiping: all cities

Small Novato association? Start with a walkthrough

A phone call or a quick note through the form on this page is enough. After we walk the property, your directors receive a free, RFP-ready written bid.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work