HOA & Condo

HOA & Condo Repiping in Palo Alto

Palo Alto has about 1,100 owner-occupied homes in 5+ unit buildings, 499 of them in buildings of 50+. Boards and managers can request a walkthrough and a written RFP-ready bid.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“They finished the repiping job quickly and did great work. Any questions or concerns I had were handled right away. The work passed inspection without any problems.”

Jasmin S. · Google review · Jun 2026

Palo Alto’s owners in larger buildings

About 1,100 owner-occupied Palo Alto homes are at the five-plus-unit size, and that count is the closest Census proxy for condominiums. Nearly half, 499, are in buildings of 50 or more, which is a heavier share than any other size band here. The remaining owners are split across smaller properties in similar numbers. A further 127 owner households are in duplexes, triplexes or fourplexes. Palo Alto has about 14,200 owner-occupied homes overall.

Building type by unit count Owner-occupied homes here
Five-to-nine 234
Ten-to-19 180
20-to-49 196
50-plus 499
Sum of five-plus 1,109
Two-to-four 127
Rented homes, five-plus 6,328

From the U.S. Census Bureau for Palo Alto: tables B25032 (tenure and structure size), B25127 and B25035 (year built), B25024 and B25003 in the 2020-2024 ACS, plus annual building permit counts.

The survey sorts homes by who lives in them, so any condo rented to a tenant moves to the 6,328 in the rental row. Association-governed homes can therefore number more than the owner column shows. Rented homes reach 2,461 at the 50-unit end and 1,484 in the 20-to-49 band. Citywide, 45.4% of occupied homes are rented, and five-plus buildings make up 29.6% of housing units.

What the year-built data tells a Palo Alto board

55.2% of occupied homes in the five-plus group were built before 1980. Roughly 3,000 trace to 1960 through 1979, 924 more to the two decades before, and 131 to 1939 or before. Half of all local housing goes back to 1963 or earlier, using the median. In between is a band of 1,686 homes from 1980 to 1999. On the newer end, about 1,600 homes date from 2000 to 2019, and 50 came in 2020 or later. Building permits added small numbers lately, with new units for five-plus-unit structures running 18, then 50, then 18 across 2023 through 2025.

A board’s questions will differ depending on which side of the 1980 line its building falls. A property from the last 25 years raises a different conversation than one from the 1960s, and a walkthrough is how we find out which one you have. As galvanized pipe corrodes internally, flow drops and threaded joints can start to weep. Aging copper is prone to pinholes. In a shared structure, a failed line inside a wall tends to involve the association and several owners together, and stacked bathrooms can send water to the homes below.

Palo Alto permits and CPAU

Permit review and inspections belong to the city’s Planning & Development Services, Development Services (Building Division). We apply, book each visit and meet the inspector there. City of Palo Alto Utilities (CPAU) is the water supplier here.

Running an HOA project in Palo Alto

Directors and their manager. Your CC&Rs set the terms. Our scope describes what the association holds and, separately, what each owner holds. Insurance certificates carry your association’s name.

People living in the building. Crews typically route fresh pipe parallel to the current system, so faucets keep working during installation. Everyone then loses water for a single day, at switchover. Crews then patch and texture any openings in drywall.

Pipe choices. Associations frequently find that copper is required by their documents. We install Type L at a 30-year warranty term, or PEX-A by Uponor at a 25-year term where permitted, with parts and labor on each.

How to request a bid here

We walk the property before quoting anything, and the estimate is free. Your board then has a written, RFP-ready bid covering the owner and association split. We are licensed and insured, CSLB #1057926. Read more about HOA and condo repiping and Palo Alto multi-family repiping.

Frequently asked questions

Are many Palo Alto condo owners in large buildings?

Yes. Census estimates for 2020-2024 place 499 of the city's 1,109 owner households at the five-plus size in properties of 50 units or larger. That makes it the largest size band for owners, ahead of 234 in the five-to-nine range.

Which utility supplies condo buildings in Palo Alto?

City of Palo Alto Utilities, known as CPAU, supplies the water. It is the only supplier our city data lists, and a separate city division handles the permit.

Who takes care of permits for a Palo Alto condo repipe?

Our team does. Filings and inspections pass through Planning & Development Services, in its Development Services (Building Division) group. We pull the permit, and we schedule and attend inspections for the association.


HOA & Condo Repiping elsewhere in Santa Clara County

All multi-unit repiping in Palo Alto · HOA & Condo Repiping: all cities

Ask for a Palo Alto HOA repipe proposal your directors can compare

Book a site walkthrough and free estimate. You will get a written bid ready for an RFP, with certificates naming the association. CSLB #1057926.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work