With a citywide median year built of 1998, Roseville condo boards may be planning ahead more than replacing failed pipe; 306 owners live in five-plus unit buildings here, 206 in 2-4 unit ones.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil’s crew ripped the old pipe out in one day. Patched the holes, swept up, water’s clear now. I was sure something would be leftover. Nope. I am very pleased!”
The numbers here argue for planning more than alarm, and we would rather say that plainly. Only 13.7% of the occupied homes in larger buildings here predate 1980, compared with about 3,800 from 2000-2019 and 243 from 2020 or later. In a young housing stock, the realistic reasons to call are specific ones: a cluster of leaks, a piping type your board has doubts about, or a reserve line that needs a real figure in it.
| Roseville measure | Latest estimate |
|---|---|
| Owners at home, buildings of 5+ units | 306 |
| Size 5-9 | 91 |
| Size 10-19 | 97 |
| Size 20-49 | 32 |
| Size 50 or more | 86 |
| Owners at home, buildings of 2-4 units | 206 |
| Occupied 5+ unit homes from 1980-1999 | 3,445 |
| Citywide median year built | 1998 |
Source: ACS 5-year release, 2020-2024, Roseville (Census tables B25032 for tenure and size, B25127 and B25035 for construction year).
If any group merits early attention, it may be the oldest slice. Some 929 occupied homes come from 1960-1979, with 144 from 1940-1959 and 121 from 1939 or before. Next in line are those built in 1980-1999, roughly 3,400 homes that have now seen a few decades of service.
Materials vary, so do not assume. Where galvanized steel exists, it rusts internally and flow slowly declines. Where copper has aged, pinholes can form. A manager can start with exposed pipe in a mechanical closet, plus a simple spreadsheet of leak dates and unit numbers, and take it from there.
Board review works when the document answers board questions. Ours, free and written, follows an on-site walkthrough, and it is prepared so that it can go straight into an RFP.
Expect it to address responsibility first. Our scope works from the CC&Rs to tell the association’s share of the plumbing from what falls to each owner, so a reader can see where the common line ends. Expect the material section next: Type L copper at a 30-year warranty term, which CC&Rs often require, or PEX-A from Uponor at 25, parts and labor on either. Certificates of insurance name the association. We specialize in repipes, and we are licensed and insured, CSLB #1057926.
Thinking of the bid as a reserve input? Say so when you call. A written number helps a reserve study far more than a guess, even when the work is some way off.
Should the board decide to proceed, we typically lay in the new runs adjacent to the current ones so the building keeps its supply, and the changeover to new pipe costs residents just one day of water. Plan any owner message around that single date. After that, we patch and texture wherever walls had to be opened.
A note for associations with landlord-owners: leased units still need someone to tell the occupant. Ask those owners to confirm they have passed on the date.
The city’s Development Services building pages explain the route: all permit applications go electronically through the Online Permitting Services portal, and permits can go to a legal owner or a licensed contractor. We pull them as the contractor and schedule the inspections.
Water depends on where you are. Roseville Environmental Utilities serves most of the city, drawing on Folsom Lake surface water it reports at 26 ppm hardness for 2025, with a small groundwater share. Placer County Water Agency also reports 1,224 treated-water accounts in Roseville, and San Juan Water District’s service-area page lists east Roseville. Your water bill settles it.
You can see the wider picture on the Roseville multi-unit page and the HOA and condo repipe overview.
It may well be. The city's median year built is 1998, so unless leak records or inspections point to a problem, a walkthrough and written bid may serve mostly as planning information.
It can give your reserve professional a written figure and a defined scope to work from. Tell us that is the purpose when you request it.
The city issues permits to a legal owner or a licensed contractor. We apply as the contractor through the OPS portal and schedule the inspections.
Usually the City of Roseville, although parts of town get service from Placer County Water Agency or San Juan Water District instead. The name on your water bill will confirm it.
All multi-unit repiping in Roseville · HOA & Condo Repiping: all cities
Call or use the request form on this page to book a walkthrough of your property. The free written bid is useful whether you act now or budget for later.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area