Between 2022 and 2024, Dixon authorized 266 homes in five-plus-unit structures; whichever of the city's two water systems serves your lot, we can bid the plumbing from your sheets.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil, Valentino, and Travis helped me out on short notice with a Repipe. Our water was out and they managed to squeeze us into their schedule and get us up and running again. Thank you guys!”
Dixon holds about 7,100 homes overall and just over a thousand in structures of five or more, 14.2% of its housing. Against that, three permit years stand out: 86 such homes for 2022, then 72, then 108 for 2024, or 266 in total. Those are authorizations rather than move-ins, so a developer scouting Dixon should not read them as finished buildings.
| Year on file | Authorized homes, 5+ unit structures |
|---|---|
| 2022 | 86 |
| 2023 | 72 |
| 2024 | 108 |
Source: Census Bureau annual place files from the Building Permits Survey, imputed annual estimates; Dixon housing counts and age from the 2020-2024 ACS 5-year tables B25024 and B25127.
Larger Dixon buildings are nearly all rental: the survey shows 948 renter households in them and 21 owner households. Sizes lean small to middling, with 311 renter households in structures of 5 to 9 homes and 343 in structures of 10 to 19, against 214 in the largest class.
Send plumbing sheets, your count of homes and the construction calendar. Each does a separate job. Sheets fix the fixtures, stacks and venting. The home count shows how much work repeats. The calendar tells us how large a crew to plan and in what order. With all three, you receive a written bid that lines up with what you plan to build.
It also helps to include the site address, since Dixon’s water service depends on location, as explained below.
The city’s median construction year is 1988. Among occupied homes in larger structures, 38.7% predate 1980, 245 arrived between 1980 and 1999, and 349 between 2000 and 2019. New buildings join that mix with piping drawn to, and checked against, today’s California Plumbing Code.
Multi-unit layouts repeat. How risers and vents get set at rough-in carries through each home, which makes the period before walls close the moment to catch any problem with them.
We answer to owners, developers and general contractors. Rough-in comes after framing, in whatever order your superintendent lays out. Our company is on site at each inspection so the following trade knows where things stand. Inspections on this type of work generally fall into stages: underground lines, rough-in ahead of drywall, then a final once fixtures are in. Nothing gets covered until its stage clears, so our schedule ties to those dates.
Senior projects are priced for that use. California’s Community Care Licensing data, downloaded October 2026, lists 2 licensed residential care facilities for the elderly in Dixon, with 134 licensed beds.
For your contract file: licensed and insured, California license CSLB #1057926.
We pull plumbing permits and schedule inspections through the Dixon Community Development Building Division.
Water takes some checking here, since two utilities publish 2025 reports for Dixon customers:
Neither report says which streets each one serves, so we confirm the supplier for your site early. Owners can also ask the city directly during due diligence.
Our new multi-family plumbing service page has more, while the Dixon multi-family plumbing page concerns buildings that already exist.
266 by the Census survey, counting five-plus-unit structures: 86, then 72, then 108.
One of two: Cal Water's Dixon District or the City's own Public Water System. Their 2025 reports do not list streets, so the answer depends on your site's location.
The City of Dixon's 2025 report says booster pumps hold its system between 52 and 62 psi. Cal Water service areas would need their own check.
Our company does, with the Dixon Building Division. We also schedule inspections and are present for them.
All multi-unit repiping in Dixon · New Construction Plumbing: all cities
Call or fill in the form below with your plans, site address, home count and calendar, and we will send a written bid.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area