Dublin has a permit entry for larger residential buildings in all four years from 2022 to 2025, topped by 207 homes in 2023, so we are ready to price your plumbing sheets.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“We had a pipe burst in the crawlspace, and when Travis and Val came out to inspect it, they found that all the copper lines were badly corroded from electrolysis. They walked us through the options and we decided to go ahead with a full repipe.…”
Every year in the 2022-2025 federal permit survey shows Dublin homes authorized in structures with at least five units: 39, then 207, then 31, then 128. The last three years total 366. The swing from year to year is wide, so one busy line in this table says little about the next one, and a developer should treat it as background, not a forecast.
| Calendar year | Homes in structures of 5 units or more |
|---|---|
| 2022 | 39 |
| 2023 | 207 |
| 2024 | 31 |
| 2025 | 128 |
Source: Census Bureau Building Permits Survey for Dublin, annual place data 2022 to 2025, with imputed totals; existing homes from 2020-2024 American Community Survey estimates, tables B25024 and B25127.
Dublin’s median home went up in 2004. Just 8.2% of occupied five-plus homes were up before 1980, while about 3,900 came along between 2000 and 2019 and another 145 in 2020 or later. Of about 6,700 homes in such structures (26.7% of the total), about 4,100 belong to the 50-plus size class, and 3,585 renter households live at that scale. Owner households in larger buildings come to 797, a smaller group.
Big complexes mean long vertical runs and many copies of a few floor plans. A small choice at rough-in, such as how risers line up from floor to floor, gets repeated dozens of times. So review those details while they are still lines on paper. Current California Plumbing Code rules apply to the design and to each inspection.
Clients are owners, developers and general contractors building apartments, condominiums or senior living. Our rough-in moves behind framing, by floor or by building, following the order your superintendent sets. Somebody from our company attends every inspection, which we also schedule.
Senior projects fit the same process. Dublin’s licensed residential care facilities for the elderly total 8 in the state’s Community Care Licensing download from October 2026, with 122 licensed beds among them. We bid senior living as well as market-rate housing.
Permit applications go to the city’s Building & Safety Division. We pull our plumbing permits there. Dublin San Ramon Services District (DSRSD) delivers the water, wholesaled by Zone 7 Water Agency, and a new service connection gets arranged with DSRSD.
Zone 7’s supply combines State Water Project and Lake Del Valle surface water with local Tri-Valley groundwater. Zone 7’s 2025 report gives very different hardness averages for the two: 88 mg/L for treated surface water and 318 mg/L for groundwater. If your design team is thinking about water treatment, have them read that report directly.
Three inputs drive our price: your plumbing sheets, how many homes they cover, and the build calendar. It reflects fixtures and stacks exactly as drawn, at the pace your calendar sets, and it arrives as a written bid you can check line for line. Issue a revised set and we adjust.
Completeness matters. Riser diagrams, fixture schedules and unit plan details let us price repeated homes accurately, with fewer allowances for what the set leaves open. If yours lacks those, tell us what is coming and when.
We are licensed and insured, CSLB #1057926. Full service details live on the new multi-unit plumbing overview, and existing properties belong on Dublin’s multi-family plumbing page.
Yearly lines run 39, 207, 31 and 128 from 2022 through 2025, per the Census permit survey for structures with at least five units.
Dublin San Ramon Services District supplies water in Dublin, with wholesale supply from Zone 7 Water Agency. The city's Building & Safety Division handles permits.
Plumbing sheets, ideally with riser diagrams and fixture schedules, plus the home count and the construction calendar.
Yes. We pull the plumbing permits, schedule inspections and have someone on site for each.
All multi-unit repiping in Dublin · New Construction Plumbing: all cities
Send plans and your calendar with the form below, or call, and a written bid will follow.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area