Permits authorized 742 five-plus units in El Cerrito in 2024 and 70 in 2025. Developers and GCs can send us the sheets for a written plumbing bid on apartment or senior living work.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”
Most of the city’s recent multi-unit activity landed in a short window. The Census Building Permits Survey shows 742 units in five-plus buildings authorized in 2024 and 70 in 2025, which comes to 812 across the two years.
| Permit year | El Cerrito units |
|---|---|
| 2024 | 742 |
| 2025 | 70 |
For El Cerrito: imputed annual estimates of 5+ unit buildings in Census Building Permits Survey place files, 2022-2025; five-year ACS, 2020-2024, B25024 with B25035 and B25127; elder care counts downloaded in October 2026 from California’s Community Care Licensing.
Against a base of about 11,200 housing units, that’s a big addition. Only about 1,900 units, 17.1%, are in five-plus properties today. About 1,800 renter households live in them, and 649 units sit in 50-plus buildings.
Whether you’re an owner, a developer or a GC, we ask for the same package: plumbing sheets, unit count, schedule. We price from that and return the number in writing. Design changes get re-priced from the revised sheets. If your set is still in design development, tell us which sheets are final; we can price what’s there and refresh the number once the set is issued.
After award, crews work to your calendar, so underground, rough-in and finish plumbing each wrap up in time for whichever trade follows. We schedule the plumbing inspections and stand there for them, which keeps sign-offs moving and walls from closing ahead of an approved rough-in. We’re licensed and insured, CSLB #1057926.
Want the sharpest number? Include riser diagrams, fixture schedules and the water heating design if you have them, and flag any part of the building that turns over early. Gaps don’t stop us from pricing. We’ll ask about them, and the number gets updated when the next drawing issue lands.
El Cerrito’s median year built is 1956. Among occupied homes in five-plus properties, 40.1% predate 1980, and just 45 date from 2020 or later. Many older apartment buildings were plumbed in galvanized steel, which corrodes from within. A new one starts fresh under current code, with stacked wet walls, risers and unit shutoffs all settled on paper.
Senior living brings its own requirements, especially accessible bathrooms built exactly as drawn. October 2026 state data lists 8 elder care facilities in El Cerrito with 191 licensed beds in total, and we bid senior projects alongside apartments and condominiums.
The El Cerrito Building Division issues building permits, and pulling the plumbing permit for our scope is on us. EBMUD supplies the city’s water. Its 2025 report places El Cerrito in the Orinda treatment plant’s area, at 14-40 ppm hardness, and has Sobrante serving as needed at 64-98 ppm. That spread is worth raising with your engineer when the water heating design gets settled.
Our new construction plumbing page lays out the service. If you also hold existing apartments or condos in town, see multi-unit plumbing in El Cerrito.
Federal survey data shows 742 for 2024 and 70 for 2025, counting five-plus buildings only.
Yes. Tell us which sheets are final. We price from what you have, then update the written bid from the issued set.
EBMUD water, usually from the Orinda plant at 14-40 ppm hardness in the 2025 report. Sobrante can serve as needed, at 64-98 ppm.
Yes. Our scope includes pulling it with the Building Division, booking the plumbing inspections and attending them.
All multi-unit repiping in El Cerrito · New Construction Plumbing: all cities
Send us your plumbing set and unit count with the schedule, even if the set isn't final. We'll return a written bid and update it when the issued drawings land.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area