Fairfield authorized 240 units in five-plus-unit projects during 2023 and 2024. For a written bid, send your plumbing sheets, the unit total and your construction calendar.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“They finished the repiping job quickly and did great work. Any questions or concerns I had were handled right away. The work passed inspection without any problems.”
Fairfield recorded 168 units in 2023 and 72 in 2024 in structures with five or more homes, according to Census Bureau permit data. Combined, that makes 240 units over two years. Every one of those homes needs plumbing drawn, permitted and inspected before anyone moves in.
| Year | Five-plus-unit building units authorized |
|---|---|
| 2023 | 168 |
| 2024 | 72 |
Fairfield data sources: California Community Care Licensing facility file (October 2026); American Community Survey for 2020-2024, covering year built (B25127), structure size (B25024) and tenure (B25032); Census permit place files for 2022-2025, with imputed annual estimates.
Our starting point is your plumbing sheets, how many homes you are building, and your construction dates. Each one answers a different pricing question. The sheets define what has to be installed. The count shows how much of it repeats from home to home. The dates show when plumbing must be ready. Owners, developers and general contractors all get the result the same way, as a written bid they can compare against the drawings. Estimates are free.
Fairfield holds about 6,600 housing units in five-plus-unit properties, 16.4% of its housing, and about 2,400 of those belong to properties with 50 or more. Another 3,000 or so are in buildings of 5 to 19 homes. Of about 6,200 occupied ones, tenants account for about 6,100 and owners 152. Among the rented group, about 2,300 sit in the largest properties, about 1,100 in the 20-to-49 range, about 1,400 at 5 to 9 homes and about 1,200 at 10 to 19. Renters hold 15,000 of about 38,800 occupied homes citywide, or 38.7%, while small 2-to-4-home properties contribute about 2,100 rented homes and 86 owned. Citywide, the median year built is 1986.
Age varies widely. 38.9% of occupied homes in these properties predate 1980, about 2,300 date from 1980 to 1999, about 1,900 from 1960 to 1979, about 1,400 date from 2000 to 2019, and just 127 are from 2020 onward. Another 462 date from 1940 to 1959, and 65 from 1939 or earlier. New projects go in under the current California Plumbing Code. Unit types tend to repeat through a building, so stacks laid out at rough-in usually set the pattern for each floor above.
Fairfield’s licensed residential care facilities for the elderly, 46 in all as of October 2026, held 1,431 beds. That averages near 31 beds apiece. New senior living buildings are part of what we bid, along with apartments and condominiums, and we price them from the drawings prepared for that building type.
The Building Safety Division of Fairfield Community Development issues permits. Plumbing permits for our scope go through us, and we are present whenever an inspector comes. Fairfield’s Public Works Water Division supplies water and is the utility for a new building’s service.
Multi-unit plumbing usually gets inspected in stages. Lines under the slab or in the ground come first, rough-in follows before walls are insulated and boarded, and a last check comes once fixtures are set. Since walls generally stay open until rough-in passes, those dates are worth marking clearly on the schedule you send us. A slip there can push back drywall and everything after it. For a project of several structures, say how they will be delivered, since each one commonly carries its own inspection sequence.
A fuller plumbing set, including riser diagrams and fixture schedules, lets repeated unit types be priced more accurately. It also helps to say whether one central system or individual heaters will serve the homes.
Our new construction plumbing service page explains the offering. Standing properties are covered on the multi-unit repiping page for Fairfield.
Census Building Permits Survey data shows 168 units in 2023 and 72 in 2024 for structures with five or more homes, 240 in all. Those two years are the ones reported on this page for Fairfield.
Building Safety, part of Community Development. Pulling the plumbing permit is our job, and we are on site for inspections. Water service for a new building is a separate matter, handled by the city's Public Works Water Division, so plan on two separate conversations during design.
Yes. Senior living buildings get bid alongside apartments and condos. Fairfield had 46 residential care facilities for the elderly and 1,431 licensed beds at the October 2026 count. Drawings for that building type are what we price from, and the bid comes back in writing.
All multi-unit repiping in Fairfield · New Construction Plumbing: all cities
Pass us your Fairfield sheets, calendar and unit total, and a written bid gets started. Licensed and insured contractor, license number CSLB #1057926.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area