Gilroy authorized 181 units in larger buildings in 2022 and 17 in 2023, and 131 homes at that scale date from 2020 or later. Developers and GCs send sheets; we return a bid.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil, Valentino, and Travis helped me out on short notice with a Repipe. Our water was out and they managed to squeeze us into their schedule and get us up and running again. Thank you guys!”
Gilroy holds about 2,700 homes in five-plus unit structures, 14.9% of its housing. Among about 2,600 occupied ones, 131 date from 2020 or later and 596 from 2000 through 2019, per the 2020-2024 American Community Survey. Authorizations from the Census permit survey add a look at what has been coming through:
| Gilroy permit year | Units authorized in 5+ unit structures |
|---|---|
| 2022 | 181 |
| 2023 | 17 |
Gilroy’s table shows imputed yearly estimates, Census Bureau Building Permits Survey, covering 2022-2025. For tenure, stock and age we used ACS 2020-2024 5-year data: B25003, B25024, B25032, B25035, B25127. Community Care Licensing at the state’s social services department supplied the care counts, October 2026.
Renters dominate those buildings, with about 2,400 renter-occupied homes against 123 owner-occupied. The median year built citywide is 1989, and 37.8% of occupied homes in those buildings were built pre-1980.
From the sheets we pull the unit mix and the fixtures per unit type, where stacks and risers go, central or per-unit water heating, and how the water service and sewer lateral arrive at the building. From the schedule we pull when each floor gets framed and when inspections have to happen. Those two documents plus your unit count are what we need to price a job. We return a written bid at no charge, along with any questions the set raises. We take residential and senior living projects only, for owners, developers and general contractors.
Work comes in phases. Underground waste and water lines go first. Rough-in and top-out for supply, drain and vent follow while framing stays open, and fixtures come after finishes. No phase gets covered until it passes inspection. Apartment layouts usually stack, so a mistake repeated over several floors gets expensive quickly, and catching it early keeps the fix small.
Senior buildings are a smaller but real part of the picture. Gilroy has 5 licensed elder care facilities with 238 licensed beds all together (state licensing data, October 2026). Accessible bathrooms and drains in that kind of project are easiest to handle before rough-in, when they can still be drawn in rather than worked around.
Our crew paces itself to your construction schedule, so plumbing is ready when framing, insulation and drywall need it. When an inspector arrives, we are there to walk the work, which lets the next trade keep moving.
The City of Gilroy Building Division sits on Rosanna Street and takes applications through its GO Permit system online. Our team pulls the plumbing permits for our scope and books each inspection. A licensed, insured contractor stands behind that paperwork: CSLB #1057926.
Water here is groundwater from city wells in the Llagas Subbasin, nine of them tested monthly according to the city’s 2025 water report. Hardness there averages 237 ppm (range 174-271), a useful number to have when the owner’s specification covers water treatment.
The service itself is on our new construction plumbing page. Existing-property owners can look at multi-unit plumbing in Gilroy for repiping.
Census figures list 181 units for 2022 and 17 for 2023, counting only buildings with at least five units.
The Building Division in Gilroy Community Development, online through GO Permit. Our plumbing portion gets its permits through us.
Yes, as well as apartments. State data for October 2026 lists five licensed elder care facilities with 238 beds in the city, and we price new ones from the sheets.
City-supplied groundwater from wells in the Llagas Subbasin. The city's 2025 report gives an average hardness of 237 ppm.
All multi-unit repiping in Gilroy · New Construction Plumbing: all cities
Forward your plumbing set, how many units, and the calendar. We'll read them closely and come back with a free written bid and a short list of any questions the set leaves open.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area