Hayward permitted 258 larger-building units in 2022. We bid and plumb new apartment and senior living buildings there for owners, developers and general contractors.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”
Census counts of units authorized in five-plus unit buildings show a large year followed by two small ones: 258 in 2022, 8 in 2023 and 6 in 2024, or 272 over the period.
| Permit year | Authorized units in 5+ unit Hayward buildings |
|---|---|
| 2022 | 258 |
| 2023 | 8 |
| 2024 | 6 |
Hayward sources: the Census permit survey’s 2022-2025 place files for five-plus unit buildings (imputed yearly; 2023 fills in unreported months); housing stock in 2020-2024 ACS tables B25024 and B25127; for elder care, California’s Community Care Licensing download of October 2026.
About 14,270 Hayward homes, 27.3% of the housing, are in five-plus unit buildings, and about 6,200 are in properties of 50 or more. Most of that was built long ago. The median year built is 1972, 48.9% of lived-in homes in those buildings predate 1980, and the survey found just 92 from 2020 or later.
Design and inspection follow the current California Plumbing Code. Because unit plans repeat, whatever stack and riser layout gets set at rough-in carries through the entire structure, so errors multiply and so does good work. That is why we want the sheets early, while a question about a riser location can still be answered on paper instead of in framed walls.
The Hayward Permit Center, in the Development Services Building Division at City Hall, 777 B Street, also runs an e-Permits system. Pulling the plumbing permits falls to us, as does attending inspections. For most of the city the supplier is Hayward’s own water utility, which buys all of its drinking water from the SFPUC, at an average 60 ppm hardness in 2025. EBMUD serves part of Hayward, so your parcel’s supplier is one of the first things we confirm.
We work for owners, developers and general contractors, on residential or senior living buildings. Your superintendent sets the order for rough-in behind framing, and our people show up for each inspection so drywall can follow without a gap. Senior housing deserves a mention in this city: state licensing data listed 38 elder care facilities here, with about 1,070 licensed beds, in October 2026.
A multi-unit job usually gets inspected at several points: below-slab or underground lines, rough-in before walls are insulated and covered, and a final once fixtures are set. Miss one and drywall moves with it, so our crew planning revolves around those dates.
We are licensed (CSLB #1057926) and insured, and a written bid comes back on those three documents at no charge. Our new-build plumbing service page has more detail, and for existing properties there is multi-unit plumbing in Hayward.
258, per the Census Building Permits Survey, then 8 in 2023 and 6 in 2024.
Most of the city is on Hayward's own utility, supplied by the SFPUC. EBMUD serves part of Hayward, and we confirm the supplier parcel by parcel.
Yes. Filing is on us, and our crew is there for the inspections.
Yes. We plumb apartment and senior living buildings from the sheets, unit count and schedule you send.
All multi-unit repiping in Hayward · New Construction Plumbing: all cities
All we need are sheets, a unit total and the build schedule. Once we review them, you receive a written price on the plumbing scope.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area