Permits for 378 units in larger Millbrae buildings landed in 2024 and 2025. Building in Millbrae? Pass along the sheets, how many units and your dates for a written plumbing price.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“We had a pipe burst in the crawlspace, and when Travis and Val came out to inspect it, they found that all the copper lines were badly corroded from electrolysis. They walked us through the options and we decided to go ahead with a full repipe.…”
Federal permit data has 236 units authorized at 5+ unit size in 2024 and 142 in 2025, for 378 across the two years. For a city with about 2,670 homes of that type, that is a lot of new plumbing to install.
| Authorized in | Millbrae units, 5+ unit buildings |
|---|---|
| 2024 | 236 |
| 2025 | 142 |
Millbrae permits: Building Permits Survey from the Census, 2022-2025, as imputed yearly estimates (2025 is partly imputed for months not reported). Housing: B25024 and B25127 in 2020-2024 Census estimates (American Community Survey, 5-year). Care facilities: Community Care Licensing records from California, downloaded October 2026.
About 2,670 of the city’s homes, 30.7% of its housing, are at properties of 5+ units, and most are not recent. The median year built is 1962, and 52.5% of the occupied homes at that scale were standing before 1980. Only 70 are from 2020 or later.
A new building answers to a different standard. Article V of Municipal Code Chapter 9.10 adopts the 2025 California Plumbing Code, and the plan set is checked against it. Multi-unit plans repeat the same unit types up the floors, so the riser and vent decisions you make at rough-in get multiplied across the building.
Three inputs drive the bid: sheets, unit count, schedule. Our written number follows the fixtures and stacks actually drawn, at the pace you need. If the architect reissues, send the revised set and we update it, so the figure stays tied to what will go in the ground and up the walls. We take residential and senior living buildings only. Licensed as CSLB #1057926, and insured on every job.
Millbrae had 12 licensed elder care facilities with 448 beds as of October 2026. New senior buildings get priced from their own drawings, since their fixture counts and accessible baths differ from a standard apartment floor.
Owner, developer or GC, your superintendent sets the order, and rough-in follows framing. The Building Division at Millbrae Community Development takes applications and documents electronically. That filing falls to us. So does scheduling inspections, and we are on hand when each comes up. Your service connection gets arranged with the City’s Public Works Water Division, which distributes San Francisco regional system water; its 2025 report shows average hardness of 62 ppm.
Plumbing inspections on these jobs usually come in stages: underground or below-slab first, rough-in ahead of insulation and drywall, then a last look with fixtures set. Nothing gets covered until rough-in passes, and our crew plans around that.
Hand us a complete set and repeated unit types can be priced accurately, one type at a time. Rentals are the larger share of the market today, with 1,910 renter households at 5+ unit addresses against 488 owners, and 419 of those owners are at the 50-plus end. So tell us early whether your project is for rent or for sale, because that shapes how the sheets divide up the piping.
More is on the new construction plumbing service page, and the Millbrae multi-unit page deals with what is already standing.
Census survey data shows 236 in 2024 and 142 in 2025. The 2025 count includes Census imputation for months not reported.
The Building Division, part of Community Development. Applications are electronic, and we pull them for you and schedule the inspections.
The City's own Public Works Water Division, which supplies San Francisco regional system water.
All multi-unit repiping in Millbrae · New Construction Plumbing: all cities
Riser diagrams and fixture schedules in the set make for a sharper number. Include your timeline and how many units, and your written bid comes back from us.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area