Morgan Hill's multi-unit permits hit 792 units in 2022 and 159 in 2025. We bid plumbing for its new apartment and senior living projects from your sheets and schedule.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Travis did the copper. Inspector passed it first shot. All done!”
New apartment work in this city arrives in waves. The Census permit file shows 792 larger-building units authorized in 2022, and 159 in 2025.
| Year issued | Morgan Hill units authorized |
|---|---|
| 2022 | 792 |
| 2025 | 159 |
Morgan Hill sources: Census permit survey files by place for 2022-2025 (five-plus unit buildings, imputed); B25024, B25035 and B25127 from the 2020-2024 ACS; state Community Care Licensing download of October 2026 for elder care.
Set that against the existing stock. The city holds about 2,000 housing units in five-plus unit buildings, 13.1% of about 15,500. By size, about 1,200 are in 5 to 19 unit buildings, 292 in 20 to 49 and 554 in 50 or more, and about 1,900 renter households live in them. So 792 in one permit year is a big step for a market this size.
Owners, developers and GCs get a price built on what they have already paid to design. We focus on apartments, condos and senior living, and we need three inputs from you:
Back comes a written bid for the plumbing scope, free of charge. If sheets get revised later, the price follows the revision, so the number in your project budget stays tied to the set you are actually building.
Half of Morgan Hill’s housing is newer than 1990, the median. Even so, 38.7% of lived-in homes across its five-plus unit buildings are pre-1980, and only 70 are from 2020 or later. Older properties may be dealing with galvanized steel or aging copper. A new building gets its drains, vents and supply lines sized together on the sheets.
Senior housing is also part of the picture, with 9 residential care facilities for the elderly and 318 licensed beds as of October 2026.
Permits run through the Building Division in Morgan Hill Development Services, at 17575 Peak Avenue. Our team takes out the plumbing permit for its scope and attends every plumbing inspection. Water comes from the city’s own utility, and all of it is groundwater, drawn from 16 active wells. Hardness in 2025 averaged 234 mg/L, about 16 grains per gallon, a number your designers may want in front of them when they spec water heating and fixtures.
Plumbing has to keep pace with framing, electrical and drywall. We plan around your schedule, track inspection dates on it, and are present when the inspector arrives so open walls get signed off before they close. The license behind all of this is CSLB #1057926, and we are insured. Read about our multi-unit new-construction plumbing, or for work in standing buildings, visit our Morgan Hill overview for existing multi-unit properties.
By the Census survey of building permits, 792 larger-building units in 2022 and 159 in 2025.
Yes. Apartments and senior living are our focus for new work, and bids come from your sheets, unit count and schedule.
The city's Building Division issues it from Development Services. We pull it for our scope and show up for each inspection.
City wells. The 2025 report lists 16 active groundwater wells and average hardness of 234 mg/L.
All multi-unit repiping in Morgan Hill · New Construction Plumbing: all cities
Forward your drawings, a unit total and your timeline. We review them and return a written plumbing bid. If the design moves, send the new sheets and we reprice.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area