Petaluma authorized 184 five-plus units in 2023 and 196 in 2025. Owners, developers and GCs can send us plumbing sheets for a written bid on new apartment or senior living buildings.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil, Valentino, and Travis helped me out on short notice with a Repipe. Our water was out and they managed to squeeze us into their schedule and get us up and running again. Thank you guys!”
New housing has kept coming through the Building Division. By the Census Bureau’s permit survey, five-plus buildings accounted for 44 authorized units in 2022, a jump to 184 the following year and 196 in 2025, making 380 over the 2023-2025 stretch.
| Year issued | Units authorized, Petaluma |
|---|---|
| 2022 | 44 |
| 2023 | 184 |
| 2025 | 196 |
Petaluma counts: Building Permits Survey place files from the US Census Bureau, 2022-2025 (imputed annual estimates, buildings of five-plus units); stock figures from B25024 and B25127, in its five-year ACS for 2020-2024.
Your team may be an owner, a developer or a GC. Either way, the sheets show what’s being installed. The unit count shows how much of it repeats. The schedule sets crew size and order of work. Put those three together and we can write a real number, not a placeholder. When drawings get revised, the bid is updated from the new sheets, so it stays tied to the current plan set. Crews are licensed and insured, under CSLB #1057926.
Five-plus properties hold about 4,060 Petaluma homes, or 16.2% of housing. Half of all housing was built by 1979, and 27.3% of the occupied five-plus homes are pre-1980. Recent construction already carries a lot of the count: about 1,610 went up from 2000 to 2019, and 79 in 2020 or later.
New plumbing here is designed and inspected under the 2025 California Plumbing Code, which the City adopts through Municipal Code chapter 17.04. Identical plans stack on shared supply and DWV lines, so whatever gets set at rough-in carries up through each floor. Getting the first floor right is most of the battle, and it’s far cheaper to catch a conflict on the sheets than in a framed wall. If a riser location looks tight against structure, we’d rather ask during the bid than after award.
The Petaluma Building Division issues the city’s building permits, and applications go in online at its Permits & Planning Hub. We pull the plumbing permits and schedule each inspection, then stay on site for it. Rough-in follows framing on your superintendent’s sequence, so walls can close on time.
City of Petaluma Water Resources & Utilities buys its supply from Sonoma Water and also holds city groundwater, and any service connection is arranged with the City. Its 2025 report lists hardness of 170.60 ppm in a City column and 109.83 ppm in a Sonoma Water column but doesn’t assign them by address. Your engineer may want to ask about it for the water heating design.
California Department of Social Services facility data for October 2026 shows 16 elder care licenses in Petaluma, with 369 licensed beds. We price senior buildings from the drawings for that type, including whatever accessible fixtures and drains are shown.
A multi-unit building’s plumbing typically gets inspected in stages: first any underground or below-slab lines, next rough-in ahead of insulation and drywall, and finally a walk after fixtures are set. Since rough-in must pass before walls close, a crew member stays available for each visit.
Scope details: new construction plumbing service. For standing buildings, use the Petaluma multi-unit plumbing page.
The federal survey has 44 for 2022, 184 for 2023 and 196 for 2025.
Yes. The City's Building Division takes applications online there, and we pull the plumbing permits and schedule the inspections on your project.
The City's utility supplies it, purchasing from Sonoma Water and also drawing on local groundwater. Your service connection is arranged with the City.
All multi-unit repiping in Petaluma · New Construction Plumbing: all cities
Share your plumbing sheets, unit count and schedule. We'll study the set and get a written plumbing bid back to your preconstruction team, updating it whenever the sheets change.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area