Vacaville authorized 356 units in five-plus-unit buildings across 2022 and 2023. Developers: send drawings, unit numbers and your project calendar to start a written bid.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil’s crew ripped the old pipe out in one day. Patched the holes, swept up, water’s clear now. I was sure something would be leftover. Nope. I am very pleased!”
Census Bureau permit data for Vacaville gives 120 units in 2022 and 236 in 2023, both for structures with five or more homes. The two years add up to 356 units authorized by building permits. With counts this low, one apartment project can account for most of a year’s count.
| Survey year | Authorized units |
|---|---|
| 2022 | 120 |
| 2023 | 236 |
Vacaville numbers draw on: Community Care Licensing records from California’s Department of Social Services (October 2026); ACS 2020-2024 tables on structure size (B25024), tenure (B25032, B25003), median age (B25035) and year built (B25127); Census permit files by place for 2022-2025, with imputed annual estimates.
Vacaville’s housing totals about 35,800 units, and 14.5% of them, about 5,200, sit in the five-plus group. Those break down to about 2,900 in buildings of 5 to 19 homes, 650 with 20 to 49, plus about 1,600 with 50 or more. Renters occupy 32.5% of homes in the city overall. In the five-plus group they hold about 4,700 homes against 103 for owners, so a new project here would join a stock that is nearly all rented. Those rented homes fall into about 1,300 in 5-to-9-home buildings, about 1,300 in 10-to-19, 629 in 20-to-49 and about 1,500 in 50-plus. Rented homes also fall into 2-to-4-unit buildings, about 2,000 of them, alongside 486 owned homes in buildings that small.
Vacaville’s licensed residential care facilities for the elderly ran to 32 in October 2026, with 766 licensed beds, or about 24 beds per facility on average. New senior projects generally bring accessible bathrooms and specific fixture layouts, and those appear on the plumbing sheets we bid from. Independent and assisted living are both in our scope, along with apartments and condominiums.
Our Vacaville bids are prepared from three inputs: plumbing drawings, how many units the project holds, and the construction calendar. You receive a written bid covering the plumbing scope, and there is no charge for it.
A typical new multi-unit job moves through underground work, rough-in and finish, and inspections usually fall between those stages. Our team pulls the plumbing permit for this scope and attends each plumbing inspection on site. Having the plumbing dates clearly marked on the calendar you send helps the bid reflect how your job will actually run. If your project comes in phases or spreads across several structures, say so when you send it.
The median year built for Vacaville housing is 1985. Among occupied homes in the larger structures, 27.3% date from before 1980. That share includes about 1,100 built during 1960-1979 and 222 built during 1940-1959. Another 1,836 are from 1980 to 1999, about 1,500 are from 2000 to 2019, and 123 are from 2020 onward. Only 25 go back to 1939 or earlier.
Pipe in older properties can eventually wear out. In general, galvanized steel rusts inside and loses flow over time, and older copper can pinhole. New construction has none of that history. Its piping is laid out fresh under the current California Plumbing Code, commonly with kitchens and baths stacked on shared risers, plus drain and vent stacks that run through each floor. Those stacks are repeated from plan to plan, which is why the sheets matter so much at bid time. A plan set carrying riser diagrams and fixture schedules shows how many times each layout gets built.
The Building Division of Vacaville Community Development issues permits. City water comes from the City of Vacaville Utilities Department.
Read the full new construction plumbing service description, or see Vacaville multi-unit repiping if you manage an existing property.
356 in total: 120 in 2022 and 236 in 2023, counting structures with five or more homes in the Census Building Permits Survey. Those are the two most recent years the data on this page reports for Vacaville.
Yes. We bid senior living along with apartments. State data from October 2026 shows Vacaville with 32 residential care facilities for the elderly and 766 licensed beds. Send the drawings for the senior project and the written bid is prepared from them.
Vacaville's Building Division, inside Community Development, issues them. Our team takes care of pulling the permit for the plumbing scope and being on site at the plumbing inspections, so you can leave that item with us. Water is a separate matter, through the City of Vacaville Utilities Department.
All multi-unit repiping in Vacaville · New Construction Plumbing: all cities
CSLB #1057926, licensed and insured. Send your Vacaville plumbing sheets, the project's unit total and a calendar for a free written bid.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area