Permits authorized 288 homes in five-plus-unit buildings in Windsor over 2023-2025, in a town the Census credits with only 718 such homes; we plumb new buildings of that type.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Gil’s crew ripped the old pipe out in one day. Patched the holes, swept up, water’s clear now. I was sure something would be leftover. Nope. I am very pleased!”
Compare the two numbers. Town housing totals about 9,650, with just 7.4% of it, 718 homes, in buildings of at least five units. Owners outnumber renters across town, too, with about 7,000 owner households to about 2,240 renter households. Then look at permits: 173 of that size in 2023, 20 in 2024, 95 in 2025. Those three years alone come to 288.
| Permit file year | Homes authorized, structures of 5+ |
|---|---|
| 2023 | 173 |
| 2024 | 20 |
| 2025 | 95 |
Source: place-level annual data, Building Permits Survey of the Census Bureau, 2023 to 2025, estimates included; town housing from ACS 5-year tables B25024 and B25127, 2020-2024.
These lines are authorizations, which is a different thing from completed buildings, so a lender or partner looking at this table should ask the Town about any one project.
Windsor’s housing is fairly young: 1993 is the median year, and 16.3% of occupied larger-building homes predate 1980. The largest group, 342, went up from 1980 through 1999, and 115 between 2000 and 2019. Permitted projects are large next to that. Their piping answers to the current California Plumbing Code, in plan and in the field.
Repeated floor plans mean a shared logic for supply, drain and vent lines. What gets set at rough-in carries up through the structure, which is why your riser diagrams deserve a close look before anyone cuts pipe.
Owners, developers and general contractors send three items: plumbing drawings, a home count and the construction calendar. Fixtures and stacks come from the drawings, repeated work from the count, pace from the calendar. You get back a written bid that is simple to check against the plans.
Fuller sets produce sharper numbers. Riser diagrams and fixture schedules let us price each repeated plan type on what is drawn. If either document is still coming, tell us when to expect it.
A GC lining up subs for a Windsor building might ask each plumbing bidder which sheet revision its number rests on, how it treats underground work, and which inspection stages its crew plan allows for. Those answers make the totals comparable.
Rough-in follows framing in the order set by your superintendent. An inspector generally looks at this class of work three times: once for lines underground, once at rough-in ahead of insulation and drywall, and last with fixtures set. Work stays uncovered until it clears, and our crew planning ties to those dates. We schedule them and we attend each.
Care buildings are priced as their own building type. In October 2026, California’s Community Care Licensing data showed 14 licensed residential care facilities for the elderly in Windsor, totaling 166 beds.
On paperwork: licensed and insured, California license number CSLB #1057926.
Windsor’s Community Development department runs the Building Division, which issues building permits. Plumbing permits for our work are pulled by us.
The Town’s Public Works Water Division supplies drinking water. Most of it, according to the Town’s water quality report, is pumped from wells near the Russian River, and the rest is bought through the Sonoma County Water Agency’s Santa Rosa Aqueduct. Your new service connection is arranged with the Town.
General scope is explained on the new-build plumbing page. For properties standing today, try Windsor multi-family plumbing.
The Census permit survey shows 173 dwellings for 2023, 20 for 2024 and 95 for 2025, in buildings of at least five units. The town has 718 existing homes of that kind.
The Town of Windsor Building Division, part of Community Development. We pull our own plumbing permits and attend inspections.
Mostly wells near the Russian River, with more bought through the Sonoma County Water Agency's Santa Rosa Aqueduct, says the Town's report.
Riser diagrams and fixture schedules. They let each repeated plan type be priced from what is actually drawn.
All multi-unit repiping in Windsor · New Construction Plumbing: all cities
Call us or use the form here to start. Send Windsor plans plus the calendar and home tally for a written bid.
Call (408) 295-4309 Get sample proposalLicensed repipe specialists serving the Bay Area