A Placerville address may fall under the city or the county for permits, and 54.4% of occupied homes in five-plus buildings predate 1980. We repipe occupied buildings, typically with a one-day switchover, and pull the permit.
Send the address and we sort out city or county first, then walk the building for free and write a per-unit bid.
“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”
“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”
“Travis did the copper. Inspector passed it the first time around! Done! The crew was very helpful and understanding when it came to my questions.”
Many 95667 addresses that say Placerville are outside the city, as the City’s own Building Division points out, and that changes who issues your permit and who sells you water. Inside city limits, plumbing permits go through the City of Placerville Building Division on the second floor of City Hall at 3101 Center St, or through its Camino online portal. Outside, they go through the El Dorado County Building Division. We confirm which applies before we file anything.
The City’s list of projects requiring a permit includes plumbing, water heaters and water service. Its field inspections run on Tuesdays and Wednesdays only, per its inspections page, which is something a schedule inside the city has to be built around. We book those through the portal or by phone and we are there when the inspector walks in.
Five-plus buildings make up 12.8% of Placerville’s 5,074 housing units, or 651 homes. Here is when they went up:
| Years | Homes occupied, 5+ unit properties |
|---|---|
| 2000 to 2019 | 164 |
| 1980 to 1999 | 133 |
| 1960 to 1979 | 290 |
| 1940 to 1959 | 48 |
| 1939 or older | 16 |
Census Bureau figures: American Community Survey (ACS) 5-year data, 2020-2024. City limits only.
That works out to 54.4% built before 1980, with 1960 to 1979 the biggest group. The median construction year across every housing type in the city is 1975. Most of these homes are rented: 637 of the 651. And 171 sit at properties of 50 or more units. Renters also occupy 629 homes in two-to-four unit buildings, which sit outside the table but can raise the same plumbing questions.
A building’s supply lines normally went in together, and they age together. In pre-1970s buildings you often still find galvanized steel, where rust grows inward and flow suffers, or early copper. As copper gets older, it starts to develop pinholes. Owners often move from spot repairs to a planned repipe once that starts happening in more than one unit. Census data shows only the build date, though. What is actually in your walls is something we learn on site, during a free walkthrough that comes before any per-unit price.
Within city limits the City of Placerville drinking water system delivers the water, through about 45 miles of main and about 2,700 meters, and it buys all of that water from El Dorado Irrigation District (EID). Its 2025 report lists a hardness average of 13 mg/L as CaCO3 (0.76 grains per gallon), in a range of 10 to 14 mg/L. EID’s Main System draws on Jenkinson Lake, Forebay Reservoir and Folsom Lake, though the report doesn’t say which plant feeds the city. Outside the limits, addresses are generally EID customers directly.
Worth knowing as an owner: the city says the line from the meter to your building is the customer’s to maintain. Keep that in mind when you budget for the building’s piping.
Your tenants keep living there. We typically run replacement lines beside the old ones, keeping water on until a one-day switchover, and hang a 7-day door-hanger that names it. One project manager holds the written schedule. Material is your call: PEX-A, which we install as Uponor-certified installers, or Type L copper; any drywall we open gets patch and texture. We specialize in repipes, licensed under CSLB #1057926 and insured. Inside the city, we would also line up the rough work with those Tuesday and Wednesday inspection days.
For the rest of the county, see Cameron Park, El Dorado Hills and our El Dorado County overview.
Multi-Unit Services
Placerville’s multi-unit market is small, so we size each of these services to the property in front of us.
Renters occupy 637 homes in five-plus buildings here, and another 629 in two-to-four unit buildings. The biggest counts are 228 at 5 to 9 units and 171 at 50 or more. We leave tenants in place. Door notices, schedules and email templates cost nothing extra, and a 7-day door-hanger announces the switchover date.
Apartment repiping in Placerville →Owner-occupied homes barely show up in five-plus buildings, a rough 14 in the estimates, so an association here may be quite small. It still gets the same paperwork: a written bid an RFP can use, insurance certificates that name the association, and association lines split from owner lines by reference to the CC&Rs.
HOA and condo repiping →California’s licensing data gives 5 Residential Care Facilities for the Elderly a Placerville address, total capacity 146. Residents there may rely on a steady routine. So we settle longer notice and a flexible calendar with the administrator, and the scope plans for ADA bathrooms and medical drains.
Senior living repiping in Placerville →About 4 hotel and motel businesses turn up in the ZIP code assigned to Placerville (Census ZIP Code Business Patterns, 2023), and that ZIP reaches beyond city limits. Rooms go in scheduled blocks arranged with operations, letting you plan inventory around the work. Permit routing depends on the address, and the price comes from a site walk.
Hotel and motel repiping →Census permit estimates, which include imputation, show 72 units in five-plus buildings authorized in the city in 2025. For residential or senior living units on the way, we need your plumbing sheets, count of units and project schedule to write a bid. We pull permits and meet inspectors, on the City’s inspection days or the County’s.
New construction plumbing →Why Repipe Champions
Two possible permit offices shouldn’t mean loose coordination. Here is what a Placerville owner gets from us.
Every Placerville project gets a dedicated PM -- your single point of contact from bid to warranty.
Old pipes stay in use while we typically install the replacement piping. The water typically goes off one day, at switchover, with opened drywall patched and textured.
We supply door notice and email templates and schedules with no extra charge. A 7-day door-hanger then gives every home the date it needs.
We work with adjusters when a claim is involved, supplying what a carrier requests. Approval is the carrier’s call, and we can’t promise its answer.
We drive out for a free walkthrough, and only then write a bid, with a price for each unit, that you can keep and compare.
You receive up to 30-year warranty protection, and it extends to parts and labor. We specialize in repipes; CSLB #1057926 is ours, and we carry insurance.
Common Questions
Service Area
Other El Dorado County communities we cover on multi-unit pages appear below.
See all of El Dorado County →Tell us the address and we will start there. The walkthrough comes with no obligation, and the bid you get in writing is free.
Licensed repipe specialists serving the Bay Area