Senior Living

Senior Living Repiping in Palo Alto

Palo Alto's 7 licensed elder care facilities hold about 1,870 beds, and 55.2% of its occupied homes in five-plus unit buildings predate 1980.

★★★★★5.0 on Google · 116 reviewsRead reviews

What property owners and homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“I had my water main replaced. They used a technology that required very little digging and replaced about 60 feet of underground pipe. When they finished, I had a new water main and my property looked just like it did when they started - absolutely perfect! You never would have known they were there.”

David H. · Google review · Nov 2026
★★★★★

“The repiping process was smooth, and the technicians were respectful of my property. Now, my showers are enjoyable, and my faucets are leak-free. A fantastic upgrade for any home.”

Jean-Luc H. · Google review · Sep 2023
★★★★★

“They finished the repiping job quickly and did great work. Any questions or concerns I had were handled right away. The work passed inspection without any problems.”

Jasmin S. · Google review · Jun 2026

Seven Palo Alto facilities, about 1,870 beds

Seven licensed residential care facilities for the elderly, all at Palo Alto addresses, appear on the October 2026 state list, yet their combined capacity reaches about 1,870 beds. So on average these are sizable communities. Around them stand about 7,440 occupied homes in larger buildings, five units and up, including 2,461 renter homes in complexes of 50-plus and 1,484 at 20 to 49.

Palo Alto item Figure
Elder care licensees on the state list (October 2026) 7
Beds these sites may hold about 1,870
Occupied homes at 5+ units about 7,440
Those from before 1980 55.2%
Median year built, all housing 1963

Palo Alto care data: RCFE file by facility city, from Community Care Licensing at California’s social services department, pulled in October 2026. Housing: Census Bureau’s five-year ACS for 2020-2024 (B25032, B25127, B25035).

What a 1963 median says about the pipes

Half of all Palo Alto housing was built before 1963, a telling statistic for anyone maintaining an older building. Within five-plus unit buildings the biggest group is 3,048 homes from 1960 to 1979, then 924 from 1940 to 1959 and 131 from 1939 or earlier. Another 1,686 came from 1980 to 1999 and 1,598 from 2000 to 2019, so your own building’s date matters.

Galvanized steel or early copper was common in that earlier construction. As galvanized corrodes inside, flow and pressure drop and the water can discolor. Copper tends toward pinhole leaks with age. In a large building, that often appears as a slow run of repeat repairs in different rooms before anyone decides to look at the whole system.

How a senior living repipe runs

Coordination starts with your administrator, who helps shape the sequence. People in your community, and their relatives, hear from us sooner than apartment tenants generally do, and our schedule stays flexible, moving around care routines when they change. This applies to independent and assisted living alike.

On the plumbing side, new pipes typically go up alongside the old, so a Palo Alto community keeps its water during installation and goes without it for one day at the changeover. Our site walk maps every ADA bathroom and medical drain, and those go into the written scope, so accessible rooms are planned before anyone arrives with tools. When a wall has to open, we patch and texture the drywall afterward.

City departments for permits and water

Permits run through Development Services at Palo Alto’s Planning & Development Services department. We pull them, then schedule each inspection. City of Palo Alto Utilities (CPAU) provides the water, so both the permit and the supply here sit with municipal departments.

Ownership in the larger buildings is mainly rental, at 6,328 renter-occupied homes in five-plus unit structures against 1,109 owner-occupied. Those counts cover all larger housing in the city, not senior buildings alone.

Requesting a written proposal

You get a free written bid after our on-site inspection, set out per unit, with scope, schedule and material all stated. Copper here means Type L, warrantied for 30 years on parts and labor; the Uponor PEX-A alternative gets 25. Licensed and insured, we specialize in repipes, and Palo Alto clients will find us listed under CSLB #1057926. For the broader service, see repiping in senior living settings. For different property types, try Palo Alto multi-unit repiping.

What Palo Alto administrators ask

How much elder care capacity does Palo Alto have?

About 1,870 licensed beds, spread across 7 elder care facilities in the city, per Community Care Licensing data from October 2026.

Is a 1960s or 1970s Palo Alto building a candidate for repiping?

It can be. 3,048 occupied homes in Palo Alto's five-plus unit buildings date from 1960 to 1979, and 55.2% overall predate 1980. Repeat leaks or falling pressure are reasons to get an inspection.

Who files for the Palo Alto permit?

We do. We pull it through City of Palo Alto Development Services and schedule the inspections.

With so many residents, how long is the water off?

Typically for one day, the changeover itself. The replacement lines are installed beside the old ones beforehand, while water stays available, and your administrator agrees the date with us.


Senior Living Repiping elsewhere in Santa Clara County

All multi-unit repiping in Palo Alto · Senior Living Repiping: all cities

Managing a large Palo Alto senior community?

Send the Palo Alto community's address, licensed bed or apartment count, plans and any record of repeat leaks. Our team can then walk the property alongside your administrator and write a free per-unit bid naming scope, schedule and material.

Call (408) 295-4309 Get sample proposal

Request a multi-unit bid

Why use this form

  • Online booking is for single-family homes in our local service area and can't take multi-unit addresses.
  • This form goes to our multi-unit team, for properties anywhere we do multi-unit work.
  • One request covers the whole building: units, building type and timeline.
  • Attach plans, photos or unit lists so the walkthrough and proposal are accurate.
  • Once you submit, we will call you to talk through your project.

* Required fields

Your contact details

About the property

Up to 10 files, 20 MB each, 50 MB in total. PDF, JPG, PNG, HEIC, WEBP, Word, Excel, DWG or ZIP.

Prefer to talk? Call (408) 295-4309.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work