✓ Cameron Park sewer repipes: 1–2 days on drains
Up to half the price of a regular plumber, quoted in writing
We specialize in repipes, drain lines very much included
Cameron Park drain lines replaced from the inside: every drain, waste and vent pipe from fixture to exit, vents through the roof included, in new cast iron or ABS.
We look at the pipe, tell you honestly where it stands, and put any price in a written quote after a free estimate.
Outdoor sewer lines are not part of this work.
“All water and sewer pipes were replaced in our single family residence by Repipe Champions. We were very happy with efficient and fast work which included professional repair of all openings in the walls and ceilings that were made for access to the pipes. I highly recommend them.”
“We had a full house repiping and sewer system replacement done this month. The team did an excellent job — professional, efficient, and always with a smile. Everything passed inspection without a single issue. They were punctual, accommodating, highly skilled, and genuinely a pleasure to work with.…”
“Santiago did an excellent job on our sewer and gas repipe. He was professional, knowledgeable, and communicated clearly throughout the entire project. The work was completed on time, the job site was kept clean, and the quality of the installation was outstanding.…”
Local Facts
Only about 7% of Cameron Park's roughly 8,000 housing units predate 1970. Most came later: about 22% in the 1970s and close to a third in the 1980s, which puts the median at 1987 (Census ACS 2020–2024). So this community has few homes with drains past the 50-year mark, and plenty of homes reaching 40 or 50 years. About 64% are single-family detached. A house from those decades may or may not need new drains yet. A look at your pipe and its repair history will answer that better than the calendar, and that look is free.
El Dorado Irrigation District did not always handle sewage. It took that on in 1960, when Cameron Park leaders asked it to run and maintain their community's system. The treatment plant today is close to home too: Deer Creek, at 1565 Deer Creek Road in Cameron Park, about two miles south of Highway 50. A Water Board notice posted by EID describes it as serving 20,000 people in the Cameron Park, Shingle Springs and Mother Lode service areas, built to handle 3.6 million gallons daily. That notice is several years old, so take the population as a snapshot.
EID's residential requirements set a clear edge: the District's repair and upkeep duty covers the piece past your property line, wherever the one-way cleanout happens to sit, unless its own records state otherwise. That document also calls for a backwater valve when fixture levels fall under the upstream manhole rim, or under curb height at the building sewer's crossing.
If sewage backs up and you are on EID sewer, the District's advice is to phone them ahead of any plumber. A technician can tell you which side of the cleanout has the problem, and that may save you a bill.
Everything between the foundation and the main stays off our list, because outdoor sewer work is something we do not do in Cameron Park. Our repipe runs indoors, from your fixtures to the spot the drain leaves the building.
Cameron Park has no city building department because it is unincorporated. The County's Building Division handles permits at 2850 Fairlane Court in Placerville, or through e-TRAKiT, though the County warns not every permit type is available there. Walk-in hours run mornings, with afternoons by appointment, and Wednesday starts later.
Its trade-permit guide draws the line clearly. Clearing a stoppage or fixing a leak needs nothing. Swap out hidden soil, waste, drain or vent piping for new material and the County calls it new work, which brings a permit plus inspection. The submittal is simple for this kind of job: partial floor plans showing the plumbing area are accepted, and a plot plan can be skipped when the work stays inside the only permitted building on the parcel. Those steps are ours to handle.
One local wrinkle: inside the architecturally controlled area of the Cameron Park Community Services District, exterior changes may need approval before the County will issue the permit. A repipe mostly happens out of sight, but roof vents are visible, so ask the CSD if you are unsure.
Sources: Cameron Park CDP housing age and type, Census Bureau 2020-2024 ACS files; How EID entered the sewage business in 1960 (District history, PDF); Water Board hearing notice describing the Deer Creek plant, on eid.org; EID Wastewater Facilities Master Plan, plant location and flows (2013); EID residential sewer rules: maintenance limit and backwater valves; EID advice on backups: call the District first; County Building Division offices, hours and e-TRAKiT note; El Dorado County trade-permit guide: exemptions, plan set, CSD approval (PDF).
What We Replace
Step one is a free estimate, and step two a written quote. Next we pull the County permit and book the inspection. Going in is cast iron or ABS pipe, while vents get renewed up past the roof line. We are licensed and insured, CSLB #1057926.
Locating post-tension cable is a third-party scan job. After that we either saw-cut along the buried pipe or tunnel below, whichever fits the house.
All the replacement happens from below the house, with zero floor cutting.
1–2 days on drains, then 1 day to patch the openings we made.
Considering your water piping at the same time? Visit Whole House Repiping in Cameron Park.
Common Questions
Call for a free estimate. We will walk through the house and tell you what we would and would not replace.
Licensed repipe specialists serving the Bay Area