Loomis, Placer County

Sewer Repipe in Loomis
Cast Iron & ABS Drain Line Replacement

✓ Loomis indoor drains done in 1–2 days

✓ Up to half the price of a regular plumber on Loomis jobs

✓ We specialize in repipes, so we can finish sooner than a general plumber in Loomis and you pay less

The Town of Loomis names Re-pipe on its plumbing permit list, and we file that paperwork for you. Our scope: the indoor waste, drain and vent pipes, roof vents among them, all renewed in ABS or cast iron.

★★★★★5.0 on Google · 116 reviewsRead reviews
Licensed & Insured Permits Pulled & Inspected ABS or Cast Iron Free Estimates

Get Your Written Quote

A free estimate shows us the layout and the access. Then you get a written price to weigh, without pressure.

  • Town Re-pipe submittal prepared by us
  • Roof vents and interior waste lines
  • New ABS or cast iron
Book Online Call (408) 295-4309

Insured, licensed: CSLB #1057926.

0% APR financing
5% off first responders, teachers, veterans & seniors

What homeowners say

★★★★★5.0 on Google · 116 reviewsRead reviews
★★★★★

“All water and sewer pipes were replaced in our single family residence by Repipe Champions. We were very happy with efficient and fast work which included professional repair of all openings in the walls and ceilings that were made for access to the pipes. I highly recommend them.”

Vicky B. · Google review · Oct 2026
★★★★★

“We had a full house repiping and sewer system replacement done this month. The team did an excellent job — professional, efficient, and always with a smile. Everything passed inspection without a single issue. They were punctual, accommodating, highly skilled, and genuinely a pleasure to work with.…”

Henry S. · Google review · Jul 2025
★★★★★

“Santiago did an excellent job on our sewer and gas repipe. He was professional, knowledgeable, and communicated clearly throughout the entire project. The work was completed on time, the job site was kept clean, and the quality of the installation was outstanding.…”

Gaby M. · Google review · Jul 2026
  • CSLB #1057926
  • Licensed & insured
  • Permits pulled & inspected
  • Free estimates
Licensed & Insured CSLB #1057926 Interior Drain Lines 5.0★ — 116 Google Reviews

Town Permit, District Sewer: Two Offices in Loomis

Half of the housing in Loomis was standing by 1980, the median year built. Census ACS 2020–2024 shows 25% from before 1970 and 25% from the 1970s, among about 3,100 units, about 84% of them detached single-family houses. A drain line from before 1970 has served more than 50 years if nobody has swapped it out. Whether yours has is what a free estimate is for. You get a written quote afterward, and nothing starts until you agree to it.

SPMUD began here in 1956

Loomis Town Hall does not run your sewer. Community leaders from Rocklin and Loomis organized the Rocklin-Loomis Municipal Utility District, established on September 24, 1956. It began at roughly 4,200 acres and 452 connections, and built its first 41-plus miles of mains between 1958 and 1962. The name changed to South Placer Municipal Utility District (SPMUD) in 1988. Today its wards cover the central part of Loomis, a piece of the west side, and the south side east of I-80.

SPMUD's Sewer Code splits the pipe outside your walls in two. The upper lateral starts two feet beyond the building wall and runs to the right-of-way; that piece is private. Beyond the property line cleanout, that lower lateral is the district's. A repair or excavation on private sewer outside a building needs an SPMUD sewer permit and inspection. District standards also want a backwater valve when a building pad sits lower than the top of the next manhole upstream.

None of that outside pipe is on our work order. We do not do lateral jobs in Loomis, and we stay with the piping in the house.

What the Building Division asks for

A Re-pipe submittal to the Town has two parts: the Building Permit Application and the declaration on smoke and carbon monoxide alarms. It goes in digitally, by email, and the office is closed to the public on Fridays. (A lateral permit is different: it also needs a copy of the approved SPMUD permit where one applies.) We assemble the submittal and book each inspection.

Ordinance 302, from December 2025, wrote the state's current Plumbing Code (2025 edition) into chapter 11.04, with Appendices A, B, C, D, I, J and K. Appendix B holds the explanatory notes on combination waste and vent systems. The chapter sets no local drain material rule, so the ABS or cast iron we install answers to the state code.

Sources: ACS 2020-2024 Loomis housing tables; SPMUD's account of its founding; SPMUD wards map and descriptions; SPMUD Sewer Code, Ordinance 24-01; SPMUD sewer permit steps; SPMUD building sewer standards, Section 7; Town mechanical and plumbing permit page; Loomis code chapter 11.04.

What Changes Inside a Loomis House

All the waste piping that serves your fixtures gets replaced, along with the vent stacks that go out the roof. We end at the exit point in the building wall or foundation, right where the outside pipe begins. New material is ABS or cast iron. As we specialize in repipes, the route and the order of work are planned before day one.

Built on a slab?

Outside technicians handle the post-tension scan, a third-party check. With results in hand, we saw-cut beside the drain's path, or tunnel beneath when the house suits that better.

Raised over a crawlspace?

Then the floor stays whole, because the work is done from down below.

How long will it run?

Pipes usually take 1–2 days. Patching then fills one last day.

Considering new supply lines while the walls are open? Our page on Whole House Repiping in Loomis explains that work.

Loomis Sewer Repipe FAQs

Where does my part of the lateral end in Loomis?
At the property line cleanout, roughly. Under SPMUD's code, the private upper lateral runs from two feet outside your wall to the right-of-way. We do not do lateral work in Loomis; that is a separate job from our indoor sewer repipe.
What paperwork does a Re-pipe permit take?
Two documents, emailed to the Town: the Building Permit Application and the smoke and carbon monoxide alarm declaration. Our office handles both.
Do I need a permit from SPMUD as well as the Town?
For interior drain work, the permit is the Town's. SPMUD's permit and inspection come into play outside the building, such as a repair on the private lateral.
Can I drop off paperwork on a Friday?
The Building Division is closed to the public on Fridays, and it takes submittals digitally by email anyway. You will not need to go in, since we file.
How much of my week will this take?
New drains need 1–2 days on most jobs. One more day handles the patching.

Time to Replace Those Loomis Drains?

Give us a call and describe the problem. We will arrange a visit, then send you a written number for the indoor work.

Our Crew in Action

Licensed repipe specialists serving the Bay Area

Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work Repipe Champions crew at work